11.
Continue grooving by turning the feed nut
to advance the grooving roll until the depth stop
collar contacts the trunnion . At this point, the
feed nut cannot be advanced any further .
12.
Continue pipe/tubing rotation for one to
three additional revolutions to ensure groove
completion .
13.
Release the safety foot-switch pedal, and
withdraw foot from the safety foot switch .
WARNING
• DO NOT place hands inside the pipe/
tubing end or in the area of the grooving
rolls while the pipe/tubing is still rotating.
Failure to follow this instruction could result
in serious personal injury.
14.
If a short length of pipe/tubing is in the tool,
manually support the pipe/tubing .
15.
To release the pipe/tubing, turn the feed nut
counterclockwise
to retract the roll arm to the
fully open position . Slide the pipe/tubing out of
the tool .
NOTICE
• The groove diameter must be within
specification for the diameter and wall
thickness of pipe/tubing. The groove
diameter should be checked and
adjusted, as necessary, to ensure that
grooves remain within specification.
TM-VE26_27
REV_C
TM-VE26
/ Operating and Maintenance Instructions Manual
Содержание VE26 Series
Страница 2: ......
Страница 42: ......
Страница 43: ...TM VE26_43 REV_C TM VE26 Operating and Maintenance Instructions Manual...