7.
Orient the VE26 tool so that the roll arm
is located in the 6 o’clock position . Align the
flat portions of the drive shaft with the chuck
jaws by turning the drive shaft . Install the tool
assembly onto the power drive by inserting the
drive shaft into the chuck and engaging the
forks of the mounting plate with the tubular
support arms of the power drive, as shown
above .
NOTE:
The forks of the mounting plate
should be approximately 4 inches/100 mm back
from the ends of the tubular support arms, as
shown above .
8.
Tighten the chuck . Ensure that the chuck
jaws engage with the flats of the drive shaft .
DANGER
• To reduce the risk of
electric shock, check
the electrical source for
proper grounding.
• Before performing any maintenance
on the tool, turn the switch on the
power drive to the “OFF” position, or
disconnect the power cord from the
electrical source.
Failure to follow these instructions could
result in death or serious personal injury.
9.
Ensure that the switch on the power drive
is in the “OFF” position . Plug the power drive
into an internally grounded electrical outlet . The
outlet must meet the requirements for the power
drive (refer to the power drive manufacturer’s
instructions) . If an extension cord is used, refer
to the “Extension Cord Requirements” section
for requirements .
TM-VE26_14
REV_C
TM-VE26
/ Operating and Maintenance Instructions Manual
Содержание VE26 Series
Страница 2: ......
Страница 42: ......
Страница 43: ...TM VE26_43 REV_C TM VE26 Operating and Maintenance Instructions Manual...