3.
Grasp the drive shaft with one hand, then use
the other hand to pull the lower roll straight off
of the tool .
4.
Replace the lower roll with the alternate size
provided .
5.
Grasp the tool with one hand, then use the
other hand to push the lower roll into the tool .
6.
Using the 8 mm hex key provided, tighten
the set screw on the back of the drive shaft to
hand-tight .
MAINTENANCE
This section provides information about keeping
the tool in proper operating condition .
LUBRICATION
1.
After every 8 hours of operation, lubricate the
two grease fittings on the tool with a No . 2EP
lithium-based grease .
2.
Once per week, apply a light oil to the
threads where the groove diameter adjustment
screw passes through the tool housing .
17
REV_D
TM-RG1200
/ Operating and Maintenance Instructions Manual
Содержание RG1200
Страница 2: ......
Страница 22: ...This page intentionally blank...
Страница 23: ...This page intentionally blank...