14
|
H.264 16-Channel Encoder Installation and Configuration Guide
Operation
Powering On the Unit
To power on the encoder:
With the unit set up as shown in
Installation
, connect the 24 VAC power
supply to the H264-16CH-ENCDR or connect PoE (or high PoE) via network
cable (RJ-45). The Status Indicator will illuminate amber (blinking) to indicate
the encoder is ON and running properly.
Powering Off the Unit
To power off the system:
With the encoder operational, disconnect the 24 VAC power supply or, if
using PoE, disconnect the network cable (RJ-45). The power indicator will
cease to illuminate, indicating a power OFF condition.