ORL-85/ORL-85P
37
5 M
ANAGING
PROJECTS
D
ELETING
A
PROJECT
The changes are immediately effective.
3.
Press the
[
F
]
button to close the edit menu.
Deleting a project
1.
Select the project you wish to delete.
2.
Press the
[
A
]
key and tap
[
Remove
]
.
3.
Tap
[
Yes
]
to permanently delete the project.
The project is deleted and removed from the list.
Activating a project
To assign measurements to a project, the project must be
activated. There can always be only one active project.
1.
Select the project you wish to activate.
2.
Tap the
button.
– or –
Press the
[
A
]
key and tap
[
Set Active
]
.
Allow a few seconds until the label
ACTIVE
is displayed at the
selected project.
NOTE:
Savings of measurement results are assigned to the selected
project.