17
6.
Boilers assembly
6.1
Boiler drum installation
1. Set up the e boiler drum on the bedding (see Fig. no 6).
2. Insert the sealing
∅
90 x 60 x 3 on the upper flanged part of the rear boiler section and bolt the flange of
heating water (see Fig. no 5) and connect the other end with the heating system.
3. Insert the sealing
∅
90 x 60 x 3 on the bottom flanged part of the rear boiler section and bolt the flange of
return water with a sleeve for the filling and discharge cock (see Fig. no 5) and connect the other end with
the heating system. In order to guarantee the boiler protection against low-temperature corrosion we
recommend to install a thermostatic valve in heating system (like ESBE TV 40).
4. For boiler connection to the heating system there must be screwed an elbow with filling and discharge
cock in the return water flange sleeve.
5. Set the smoke pipe on the smoke adapter and insert it into chimney opening
6. Threaded hole Js 6/4 "in the front boiler section is blinded with a plug Js 6/4" with sealing
∅
60 x 48 x 22.
7. By means of boiler putty are stuck 4 pieces of insulation according to Fig. no 5c into the stoking and ash
door.
Fig. no. 9
Connection dimensions at boiler
Содержание HERCULES ECO
Страница 1: ...VIADRUS HERCULES ECO Manual for boiler operation and installation GB_2015_11 SD...
Страница 21: ...21 1 Partition of combustion chamber 2 Turbulators 3 Gripping of partitions Fig no 13a...
Страница 23: ...23 1 Partition of combustion chamber 2 Turbulators 3 Plate for ashes on the sheet metal Fig no 14a...
Страница 40: ...VIADRUS HERCULES ECO VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...