15.  Defects and their elimination  

 

The defects can only be eliminated by a trained contractual service organization which is also obliged to enter 
the repair in the guarantee certificate.  
The defects market with symbol “

∗∗∗∗

„ can be eliminated by the user himself.  

If the safety thermostat or the combustion products return flow fuse get repeatedly blocked it is also 
necessary to call a contractual service worker. 

 

 

DEFECT 

REASON 

 

ELIMINATION  

1. 

After having switched on the boiler 
the  control  lamp  on  the  main 
switch does not light up  

No voltage on the boiler inlet  

 

Check the voltage in the socket 

Faulty control lamp 
Faulty fuse 

 

Exchange the switch 
Exchange the fuse 

2. 

Boiler  cannot  be  started  –  the 
ignition  electrode  for  pilot  burner 
ignition does not sparkle.  
 

Faulty automatics 

 

Exchange the automatics 

Interrupted inlet to the ignition  

 

Check the perfect connection between the 
electrode  and  the  HV  output  to  the 
automatics 

Faulty electrode 

 

Exchange the electrode 

3. 

Boiler 

cannot 

be 

started 

– 

sparkling  runs  in  the  automatics 
spark  gap  (discharger)  (audible 
sparkling sound in automatics)  
 

Wrong  spark  gap  (discharger)  
setting 

 

Adjust according to Fig. no. 2 

Wrong conductors connection to 
electrodes or a faulty electrode  

 

Check  the  electrodes  condition  and 
connection of ignition and earth conductor  

4. 

Boiler  doesn’t  ignite    -  the  ignition 
electrode  is  sparkling–  Hon.  Ts´= 
50  s;  (on  the  burner  automatics 
the  „ALARM“  control  lamp  lights 
up 

in 

the 

automatics 

with 

signalisation) 

Boiler gas supply is interrupted 

 

Check the gas pressure in gas connection  

*  Check the appliance gas closure opening  

Gas piping air lock  

 

Bleed the piping  

Gas valve does not open  

 

Valve exchange 

5. 

Boiler lit but is out immediately  
(on  the  burner  automatics  the 
„ALARM“ 

signal 

lamp 

of 

automatics with signalisation lights 
up) 
  

Wrong  connection  between  the 
zero and phase conductors 
 

 

Check and exchange the connection 
terminal U – phase conductor  
terminal N – zero conductor 

Wrong diameters of gas nozzles 
in burner  

 

Check  whether  the  nozzles  diameter  in 
the main burner corresponds to the values 
in tables no. 2. 

Impassable 

filter 

of 

course 

impurities on gas valve inlet 

 

Clean  the  gas  valve  filter  by  blowing  out 
(in  case  of  fine  impurities  the  dimensions 
of  which  are  the  same  as  the  filter  mesh 
diameter  the  whole  gas  valve  must  be 
exchanged)  

6. 

Boiler  cannot  be  ignited–  the 
safety  thermostat  switched  off  (on 
the  control  panel  in  the  network 
module the exceeded temperature 
signal lamp lights up)  

Faulty boiler thermostat 

 

Exchange the boiler thermostat 

 

*  Unblock the thermostat in network module 

- TB 

Insufficient water circulation  
(the pump doe not work) 

*  Switch over the revolutions 
 

Check  the  pump  operation  (release  the 
rotor) 

 

 

Exchange the pump 

filter clogged before the pump  

*  Clean the filter 

Lack of water in the system 

*  Check  the  water  pressure  in  the  system 

and possible water refilling  

 

Check the pressure in the expansion tank 
(if a closed heating system is used) 

*  Check the three-way valve  

(if the HWS heating is connected)  

8. 

To  the  boiler  there  is  connected 
the  stack  HWS  heater  according 
to the recommended diagram and 
the 

HWS 

isn’t 

heated 

preferentially  

Faulty  connection  of  Honeywell 
V 4044F three-way valve  

 

Check  the  valve  connection  –  see  fig.no. 
15 

Faulty three-way valve  

 

Exchange the valve  

9. 

To  the  boiler  there  is  connected 
the  stack  HWS  heater  according 
to the recommended diagram and 
HWS  isn’t  heated  to  the  required 
temperature  or  it  does  not  show 
the required temperature  

Wrong  temperature  setting  on 
the thermostats 

*  Change 

the 

setting 

see 

chap.  

no. 11 

Faulty  heater  thermometer  or 
thermostat, 

or 

the 

boiler 

thermostat  

 

Exchange  the  faulty  safety  or  regulation 
element  

10.  The  combustion  products  return 

flow fuse blocked  
  

Clogged chimney  

 

Clean the chimney  

A  strong  wind  inducing  the 
counter-pressure  

*  unblock  the  combustion  products  return 

flow  fuse  by  using  the  "RESET"  button  in 
the network module.  

Содержание GRAND G 36

Страница 1: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Страница 2: ...ter construction 14 7 3 Honeywell V 4044F three way valve technical data 16 8 Positioning and installation 16 8 1 Regulations and directions 16 8 2 Positioning possibilities 17 9 Delivery and assembly...

Страница 3: ...transient resistance tests If you require preferential heating of hot service water you can order separately stationary VIADRUS OV 100L heater the design of which corresponds to VIADRUS GRAND G 36 boi...

Страница 4: ...flow rate at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Effic...

Страница 5: ...ear part of boiler is equipped with pipes 1 1 2 At the return water connection there is installed the discharge valve At the heating water outlet there must be installed an automatic bleeder valve whi...

Страница 6: ...part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade 24 Inlet PG 9 25 Inlet PG 11 26 Electric panel 27 Electric panel cover 28 Thermoman...

Страница 7: ...ht outer section 5 1 1 Equitherm regulation Optionally together with boiler there is delivered one of four kinds of regulation or their combination according to the purchase order key stated in chapte...

Страница 8: ...ng valves Other regulator characteristics The heating circuits can be preset as independent two independent heating circuits or as dependent floor heating combined with radiators The independent sched...

Страница 9: ...l switch on If the flame goes out during the normal operation the ignition automatics will repeat the ignition cycle The ignition pilot burner is switched off together with the main burner Other contr...

Страница 10: ...H1 boiler under voltage signalling Z1 suppression component TC241 BT2 combustion products thermostat H2 failure signalling BT1 safety thermostat BT4 boiler thermostat M9 combustion products ventilato...

Страница 11: ...sion component X1 X11 boiler terminal boards M9 combustion products ventilator Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater thermostat BT5 indoor thermostat dr...

Страница 12: ...ll S4565 BF 1112 1 Y1 gas valve VK 4100 A 1002 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main switch H1 boiler un...

Страница 13: ...1 A4 the pump operation is controlled according to regulator programme see chap 5 1 Fig no 5 Grundfos UPS 25 40 pump characteristics 7 Stack hot service water heaters 7 1 Technical data of recommended...

Страница 14: ...ey die within several seconds 7 2 Heater construction To the boiler you can order VIADRUS OV 100L separate stack heater for a preferential hot service water preparation in the same design as G 36 boil...

Страница 15: ...ck 16 radiator vale Note It is possible to use a combined fitting consisting of a safety valve and a clack valve Hot service valve inlet Cold service water inlet heating water inlet return water inlet...

Страница 16: ...ding to the valid regulations must be prepared for installation The heating system must be filled with water that meets the SN 07 7401 requirements especially its harness must not exceed the required...

Страница 17: ...0 335 1 ed 2 Household and similar electrical appliances Safety Part 1 General requirements EN 60 335 2 102 Household and similar electrical appliances Safety Part 2 102 Particular requirements for ga...

Страница 18: ...k wood hobrex boards plywood werzalit umakart sirkolit C D medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring E F easily combustible Asphaltboard fibreboards cellulo...

Страница 19: ...lation A1 1 pc regulator RVA 43 222 set of connectors SVA 43 222 terminal board WAGO 63 with a conductor bundle 43 submersible sensor B2 type QAZ 21 Regulation A2 1 pc regulator RVA 43 222 1 pc regula...

Страница 20: ...sition and well balanced 2 Mount the TE joint at the heating water outlet from boiler the discharge valve at the heating water inlet and automatic bleeder valve Fig no 12 at the heating water outlet T...

Страница 21: ...sembly Fig no 14 Honeywell V 4044F three way valve 8 Connection to gas Gas is connected to boiler through the gas spherical closing cock 9 Release the bleeder screw of automatic bleeder valve It must...

Страница 22: ...ating system with water we only refill a cold boiler in order to prevent the boiler sections from disruption 10 Commissioning instructions for contractual service organization The boiler commissioning...

Страница 23: ...ited and in case of a superior regulation to a higher temperature the rated output is ignited If the ignition cycle has run up without lighting the burner then the failure signalisation lights up on t...

Страница 24: ...ush button in shape off an arrow 3 If the arrow is turned against the gas flow direction the start is the slowest see fig no 17 curve MIN 4 If the arrow is turned in the gas flow direction the start i...

Страница 25: ...central heating After the water heater has been heated to the required temperature the three way valve switches automatically to the heating position and heating water from boiler flows into radiators...

Страница 26: ...urn flow fuse will close the fuel supply to the boiler The user can unblock the fuse by means of TS unblocking push button The boiler can only be restarted once the combustion products return flow fus...

Страница 27: ...d air through the diffuser or by using the vacuum cleaner mount back the ignition pilot burner and then the whole burner remove the dust from ignition pilot burner by using the compressed air 11 Mount...

Страница 28: ...uctors Check and exchange the connection terminal U phase conductor terminal N zero conductor Wrong diameters of gas nozzles in burner Check whether the nozzles diameter in the main burner corresponds...

Страница 29: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Страница 30: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 31: ...t by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service orga...

Страница 32: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Страница 33: ...ll be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contract...

Страница 34: ...34...

Страница 35: ...ied out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servic...

Страница 36: ...36 Date of revision 16 2013 GB...

Страница 37: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Страница 38: ...es 8 6 Delivery and assembly 10 6 1 Assembly procedure 10 7 Commissioning instructions for contractual service organization 11 7 1 Verification activities before commissioning 11 7 1 2 Putting into Op...

Страница 39: ...cuits that is equipped by a combined regulation valve SIT 820 NOVA mV with igniting by means of a burning pilot with a burning electrode a thermocouple and an mV generator Connection of a room thermos...

Страница 40: ...at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Efficiency at m...

Страница 41: ...is placed in the head casting of the right edge section A built in draft damper with a demountable cleaning cover and a neck for putting a stack on are connected to the top part of the boiler body by...

Страница 42: ...he frontal part of boiler shell 16 Side shell right 17 Side shell left 18 The upper part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade...

Страница 43: ...pecial one stage combined electromagnetic valve 1 SIT 820 NOVA mV with continuous starting up for ZP The boiler may be operated at firmly set output power from the production company the boiler is set...

Страница 44: ...N 12007 3 Gas supply systems Pipelines for maximum operating pressure up to and including 16 bar Part 3 Specific functional recommendations for steel EN 12007 4 Gas supply systems Pipelines for maximu...

Страница 45: ...ceramic tiles mortars fireproof plasters A2 combustible with difficulty acumin izumin heraklit lignos boards and basalt felt fibreglass boards B hardly combustible Beech and oak wood hobrex boards pl...

Страница 46: ...by using the boiler base plate in which there are on the left and right hand side prepared two circular openings determined for putting on the removal hooks By means of hooks the boiler can be lifted...

Страница 47: ...nd atmosphere During the heating season the water expanding in the tank absorbs the oxygen which increases the corrosive effects and at same time water evaporates significantly For a refill there can...

Страница 48: ...ng burner Turn the regulation knob to the position of igniting and ignite the burner by the piezoelectric ignitor Set the size of the flame by means of the screwdriver and the setting screw in order t...

Страница 49: ...the boiler must be put out of operation during the works insulation works boiler room cleaning that cause the dustiness Even a partial clogging of burner with impurities will degrade the combustion p...

Страница 50: ...hole burner back at its place 11 Re assemble the cover of draft damper the insulation and the top part of the casing 12 Open the gas inlet and switch the boiler on 13 Check the tightness of the gas in...

Страница 51: ...e opening Gas piping air lock Bleed the piping Gas valve does not open Valve exchange Failure of thermocouple Change the thermocouple Failure of generator or faulty generator contact Change the genera...

Страница 52: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Страница 53: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 54: ...18...

Страница 55: ...ut by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service org...

Страница 56: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Страница 57: ...ill be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contrac...

Страница 58: ...22...

Страница 59: ...ried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servi...

Страница 60: ...24 Date of revision 32 2013 GB...

Отзывы: