7.1.2  Putting into Operation 

 

1.  Igniting of the burner 

-  Open manual gas cock before putting the boiler into operation. 
-  Turn the regulation knob on the valve at the mark of igniting * 
-  Press the regulation knob and keep it pressed. 
-  Press the button of the piezoelectric ignitor and look through monitoring window at the igniting burner 

if there is a flame. 

-  If there is no flame at the burner, press the button of the piezoelectric ignitor again. 
-  If  there  is  a  flame  at  the  burner,  keep  the regulation knob pressed for about 20 seconds, release it 

and check if there is still flame at the burner alight. 

-  If the flame expired when you released the regulation knob, repeat the whole igniting cycle. 

-  Turn the regulation knob anti clockwise to the mark of 

 

 

. By that the valve is opened and the burner 

is ignited. 

-  Gas inlet to the main burner can be stopped by turning the regulation knob clockwise to the mark *. 
-  Gas inlet to the igniting burner can be stopped by turning the regulation knob clockwise to the mark 

2. 

Set  the  igniting  burner  and  adjust  the  thermal  output  power  of  the  boiler  according  to  the  following 
chapter no. 7.1.3.  

3. 

Execute the heating test. 

 

7.1.3  Setting and Adjustment of Thermal Output Power of Boiler 

 

1. 

Measure input pressure of the gas. 

2. 

Connect the manometer (U-tube) at the measuring point of output gas overpressure at the gas valve. 

 
Set the size of flame at the igniting burner: 

Turn the regulation knob to the position of igniting * and ignite the burner by the piezoelectric ignitor. 

Set the size of the flame by means of the screwdriver and the setting screw in order that it heated the 
thermocouple and  mV generator. 

The  flame  size  (volume  of  gas)  decreases  while  turning  clockwise  and  increase  while  turning 
anticlockwise. 

 
Procedure  of  output  power  setting  for  the boiler intended for burning of natural gas (SIT 820 NOVA 

mV 0820303): 

Turn the regulation knob to the position 

 

 

 (there is a flame at the igniting burner). 

Set  the  needed  gas  overpressure  at  the  gas  pressure  regulator  at  the  valve  by  the  internal  regulation 
screw.  The  gas  overpressure  increases  while  turning  clockwise  and  decreases  while  turning 
anticlockwise. The power output may be set according to customer requirement to a value according to 
Table no.2 (every size can be set in the range stated in the Table 2) 

If the set values do not comply with the required values, repeat the whole procedure. 

 
 

 

 

Pict. no. 7  Gas valve SIT 820 NOVA mV 

 

Gas pressure regulator for 
burner (the regulation screw 
is accessible after 
disassembling of the cover 
of the regulation screw) 
 
Measurement of input gas 
overpressure 
 
Measurement of output  
gas overpressure 
(gas pressure at burner 
nozzles) 
 
Gas inlet to valve 

 
 
 

Control knob of valve 
 
Gas pressure regulator for igniting 
burner 
 
Connection of thermocouple, 
safety thermostat and safety piece 
of return flow for burnt gases. 
 
Terminal board for connection of 
mV generator, boiler thermostat 
and room thermostat  
 
Gas outlet for igniting burner  
 
 
 
Gas outlet for burner

 

Содержание GRAND G 36

Страница 1: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Страница 2: ...ter construction 14 7 3 Honeywell V 4044F three way valve technical data 16 8 Positioning and installation 16 8 1 Regulations and directions 16 8 2 Positioning possibilities 17 9 Delivery and assembly...

Страница 3: ...transient resistance tests If you require preferential heating of hot service water you can order separately stationary VIADRUS OV 100L heater the design of which corresponds to VIADRUS GRAND G 36 boi...

Страница 4: ...flow rate at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Effic...

Страница 5: ...ear part of boiler is equipped with pipes 1 1 2 At the return water connection there is installed the discharge valve At the heating water outlet there must be installed an automatic bleeder valve whi...

Страница 6: ...part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade 24 Inlet PG 9 25 Inlet PG 11 26 Electric panel 27 Electric panel cover 28 Thermoman...

Страница 7: ...ht outer section 5 1 1 Equitherm regulation Optionally together with boiler there is delivered one of four kinds of regulation or their combination according to the purchase order key stated in chapte...

Страница 8: ...ng valves Other regulator characteristics The heating circuits can be preset as independent two independent heating circuits or as dependent floor heating combined with radiators The independent sched...

Страница 9: ...l switch on If the flame goes out during the normal operation the ignition automatics will repeat the ignition cycle The ignition pilot burner is switched off together with the main burner Other contr...

Страница 10: ...H1 boiler under voltage signalling Z1 suppression component TC241 BT2 combustion products thermostat H2 failure signalling BT1 safety thermostat BT4 boiler thermostat M9 combustion products ventilato...

Страница 11: ...sion component X1 X11 boiler terminal boards M9 combustion products ventilator Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater thermostat BT5 indoor thermostat dr...

Страница 12: ...ll S4565 BF 1112 1 Y1 gas valve VK 4100 A 1002 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main switch H1 boiler un...

Страница 13: ...1 A4 the pump operation is controlled according to regulator programme see chap 5 1 Fig no 5 Grundfos UPS 25 40 pump characteristics 7 Stack hot service water heaters 7 1 Technical data of recommended...

Страница 14: ...ey die within several seconds 7 2 Heater construction To the boiler you can order VIADRUS OV 100L separate stack heater for a preferential hot service water preparation in the same design as G 36 boil...

Страница 15: ...ck 16 radiator vale Note It is possible to use a combined fitting consisting of a safety valve and a clack valve Hot service valve inlet Cold service water inlet heating water inlet return water inlet...

Страница 16: ...ding to the valid regulations must be prepared for installation The heating system must be filled with water that meets the SN 07 7401 requirements especially its harness must not exceed the required...

Страница 17: ...0 335 1 ed 2 Household and similar electrical appliances Safety Part 1 General requirements EN 60 335 2 102 Household and similar electrical appliances Safety Part 2 102 Particular requirements for ga...

Страница 18: ...k wood hobrex boards plywood werzalit umakart sirkolit C D medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring E F easily combustible Asphaltboard fibreboards cellulo...

Страница 19: ...lation A1 1 pc regulator RVA 43 222 set of connectors SVA 43 222 terminal board WAGO 63 with a conductor bundle 43 submersible sensor B2 type QAZ 21 Regulation A2 1 pc regulator RVA 43 222 1 pc regula...

Страница 20: ...sition and well balanced 2 Mount the TE joint at the heating water outlet from boiler the discharge valve at the heating water inlet and automatic bleeder valve Fig no 12 at the heating water outlet T...

Страница 21: ...sembly Fig no 14 Honeywell V 4044F three way valve 8 Connection to gas Gas is connected to boiler through the gas spherical closing cock 9 Release the bleeder screw of automatic bleeder valve It must...

Страница 22: ...ating system with water we only refill a cold boiler in order to prevent the boiler sections from disruption 10 Commissioning instructions for contractual service organization The boiler commissioning...

Страница 23: ...ited and in case of a superior regulation to a higher temperature the rated output is ignited If the ignition cycle has run up without lighting the burner then the failure signalisation lights up on t...

Страница 24: ...ush button in shape off an arrow 3 If the arrow is turned against the gas flow direction the start is the slowest see fig no 17 curve MIN 4 If the arrow is turned in the gas flow direction the start i...

Страница 25: ...central heating After the water heater has been heated to the required temperature the three way valve switches automatically to the heating position and heating water from boiler flows into radiators...

Страница 26: ...urn flow fuse will close the fuel supply to the boiler The user can unblock the fuse by means of TS unblocking push button The boiler can only be restarted once the combustion products return flow fus...

Страница 27: ...d air through the diffuser or by using the vacuum cleaner mount back the ignition pilot burner and then the whole burner remove the dust from ignition pilot burner by using the compressed air 11 Mount...

Страница 28: ...uctors Check and exchange the connection terminal U phase conductor terminal N zero conductor Wrong diameters of gas nozzles in burner Check whether the nozzles diameter in the main burner corresponds...

Страница 29: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Страница 30: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 31: ...t by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service orga...

Страница 32: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Страница 33: ...ll be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contract...

Страница 34: ...34...

Страница 35: ...ied out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servic...

Страница 36: ...36 Date of revision 16 2013 GB...

Страница 37: ...Hercules U26 N vod k obsluze VIADRUS GRAND G 36 MANUAL FOR BOILER OPERATION AND INSTALATION...

Страница 38: ...es 8 6 Delivery and assembly 10 6 1 Assembly procedure 10 7 Commissioning instructions for contractual service organization 11 7 1 Verification activities before commissioning 11 7 1 2 Putting into Op...

Страница 39: ...cuits that is equipped by a combined regulation valve SIT 820 NOVA mV with igniting by means of a burning pilot with a burning electrode a thermocouple and an mV generator Connection of a room thermos...

Страница 40: ...at maximum heat output m 3 h 1 1 980 2 953 3 920 4 727 5 605 Gas volume flow rate at minimum heat output m 3 h 1 1 390 2 072 3 141 4 041 4 837 Efficiency at maximum heat output 90 5 92 Efficiency at m...

Страница 41: ...is placed in the head casting of the right edge section A built in draft damper with a demountable cleaning cover and a neck for putting a stack on are connected to the top part of the boiler body by...

Страница 42: ...he frontal part of boiler shell 16 Side shell right 17 Side shell left 18 The upper part of boiler shell 19 The rear part of boiler shell 20 Base 21 Panel rear part 22 Electric panel bracket 23 Shade...

Страница 43: ...pecial one stage combined electromagnetic valve 1 SIT 820 NOVA mV with continuous starting up for ZP The boiler may be operated at firmly set output power from the production company the boiler is set...

Страница 44: ...N 12007 3 Gas supply systems Pipelines for maximum operating pressure up to and including 16 bar Part 3 Specific functional recommendations for steel EN 12007 4 Gas supply systems Pipelines for maximu...

Страница 45: ...ceramic tiles mortars fireproof plasters A2 combustible with difficulty acumin izumin heraklit lignos boards and basalt felt fibreglass boards B hardly combustible Beech and oak wood hobrex boards pl...

Страница 46: ...by using the boiler base plate in which there are on the left and right hand side prepared two circular openings determined for putting on the removal hooks By means of hooks the boiler can be lifted...

Страница 47: ...nd atmosphere During the heating season the water expanding in the tank absorbs the oxygen which increases the corrosive effects and at same time water evaporates significantly For a refill there can...

Страница 48: ...ng burner Turn the regulation knob to the position of igniting and ignite the burner by the piezoelectric ignitor Set the size of the flame by means of the screwdriver and the setting screw in order t...

Страница 49: ...the boiler must be put out of operation during the works insulation works boiler room cleaning that cause the dustiness Even a partial clogging of burner with impurities will degrade the combustion p...

Страница 50: ...hole burner back at its place 11 Re assemble the cover of draft damper the insulation and the top part of the casing 12 Open the gas inlet and switch the boiler on 13 Check the tightness of the gas in...

Страница 51: ...e opening Gas piping air lock Bleed the piping Gas valve does not open Valve exchange Failure of thermocouple Change the thermocouple Failure of generator or faulty generator contact Change the genera...

Страница 52: ...riting on the basis of an telephonic agreement If the above instructions are not observed then the guarantees provided by manufacturer will not be acknowledged The manufacturer reserves the right to m...

Страница 53: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 54: ...18...

Страница 55: ...ut by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting service org...

Страница 56: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Страница 57: ...ill be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contrac...

Страница 58: ...22...

Страница 59: ...ried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufacturer through the contracting servi...

Страница 60: ...24 Date of revision 32 2013 GB...

Отзывы: