Vertiv
|
NetSure -48V DC Bulk Output Power System Installation and User Instructions (UM582127100)
|
Rev. E
45
Figure 16:
Installing Rectifier Modules into Spec. No. 588705000 Rectifier Module Mounting Shelf
Initially Starting, Configuring, and Checking System Operation
Important Safety Instructions
ALERT!
Performing various steps in the following procedures may cause a service interruption and/or
result in the extension of alarms. Notify any appropriate personnel before starting these procedures.
Also, notify personnel when these procedures are completed.
Initial Startup Preparation
•
Ensure that all blocks, except the last one, in the “Installation Acceptance Checklist” starting on page 1
have been checked.
•
Ensure that rectifier module mounting positions are filled by a rectifier module or a blank cover panel as
desired. It is acceptable for positions to be left vacant.
•
Refer to the configuration drawing (C-drawing) supplied with your power system documentation for
factory settings of adjustable parameters.
Initially Starting the System
Procedure
1.
Apply DC input power to the system by closing the external DC disconnect(s) or protective device(s)
that supplies battery power to the system, if furnished.
2.
Apply AC input power to the system by closing ALL external AC disconnects or protective devices that
supply AC power to the rectifier module mounting shelves. Rectifiers automatically start.
NCU Controller Initialization
Refer to the NCU Instructions (UM1M830BNA) for detailed instructions.
for locations of the NCU local indicators and navigation keys.