[ ] 5.
Ensure the enable/disable switch on the power extend converter is in the disable (down)
position. See Figure 25.
Figure 25:
Enable/Disable Switch
[ ] 6.
Plug the power extend converters into the distribution panel. See
[ ] 7.
Secure the power extend converters to the front mounting bracket with the screws provided with
the power extend converters. Torque hardware as indicated in
[ ] 8.
Place the enable/disable switch on the power extend converter to the enable position. See
. If two or three power extend converters are connected in parallel to a load that exceeds 1000
watts peak, they should be switched on simultaneously.
[ ] 9.
Observe the status of the power extend converter front panel local indicator. If operating normally,
this indicator should be illuminated green. See
[ ] 10.
Enable the external alarms or notify appropriate personnel that this procedure is finished.
[ ] 11.
Ensure that there are no local or remote alarms active on the power system.
Status Indicator
Enable / Disable Switch
Output Voltage Test Points
Enable
Disable
Vout+
Vout-
Ensure the enable/disable switch
on the power extend converter is
in the disable (down) position
before installing.