Vertiv
|
eSure™ Power Extend Converter Mounting Bracket Kit Installation Manual (IM565460)
|
Rev. D
15
Single Power Extend Converter Installation – Top Row
To parallel power extend converters in the top row, refer to the procedure “Parallel Power Extend Converter
Installation – Top Row” starting on page 21.
Procedure
[ ] 1.
Move the grounding tab from the top of the power extend converter to the bottom per
Figure 9:
Moving Grounding Tab from Top of Unit to Bottom
[ ] 2.
If the power extend converter is to be installed for a newly connected load, connect the load and
load return cables for the position to be occupied by the power extend converter. At the same time,
connect the power extend converter return wire faston tab (P/N 565990) provided with the power
extend converter to the cabinet’s return busbar (use the same location as the return lead to the
load). See
. Torque hardware as indicated in
[ ] 3.
If the power extend converter is to replace an existing circuit breaker, remove the circuit breaker
and verify the load and return cables for the position are wired and labeled correctly. At the same
time, connect the power extend converter return wire faston tab (P/N 565990) provided with the
power extend converter to the cabinet’s return busbar (use the same location as the return lead to
the load). See
. Torque hardware as indicated in
Move grounding tab from top of unit to bottom by removing the screw
securing it to the top. Set the grounding tab and screw aside. Remove
the bottom screw. Secure the screw removed from the bottom location
into the top location (note that it is a different length then the screw used
to secure the grounding tab). Orient the grounding tab in the bottom
location as shown in the illustration and secure with the screw removed
from the top location (longer screw). Torque both screws to 5.8 in-lbs.
M3 x 6 mm
Flat Head Screw
M3 x 4 mm
Flat Head Screw
M3 x 6 mm
Flat Head Screw
M3 x 4 mm
Flat Head Screw