Vertiv
|
eSure™ Power Extend Converter Mounting Bracket Kit Installation Manual (IM565460)
|
Rev. D
12
[ ] 8.
Orient the kit supplied front mounting bracket as shown in
(top distribution panel). Note
that the bracket comes preassembled with mounting hardware. Secure the front bracket to the left
and right brackets by tightening the captive fasteners. Torque hardware as indicated in
Figure 6:
Install Front Mounting Bracket
[ ] 9.
If the bottom distribution panel is to be populated with power extend converter(s), remove the
plastic shield from the bottom distribution panel by loosening the screws securing it. Slide the shield
up and out to remove it. The shield will not be reused. Tighten or remove the screws that secured
the shield to the bottom distribution panel. See
[ ] 10.
Remove one of the kit supplied distribution position labels (see
) from one of the kit
supplied storage pouches and (using the plastic shield removed from the top distribution panel as a
guide) record the distribution positions onto the kit supplied label.
[ ] 11.
Place the kit supplied distribution position label (see
) back into the kit supplied storage
pouch or remove the backing from the label and adhere it to a suitable surface near the power
system. If the kit supplied distribution position label is placed back into the storage pouch, remove
the backing from the hook-and-loop fastener factory attached to the storage pouch and adhere the
storage pouch to a suitable surface near the power system.
[ ] 12.
Repeat the above steps with the second storage pouch and label if the bottom distribution panel is
to be populated with power extend converter(s).
Kit Supplied Front
Mounting Bracket
Torque to
9.6 in-lbs.
Torque to
9.6 in-lbs.
582137000 List DJ
Distribution Panel
(others similar)