4.5
Load Connections
To Distribution Bus Row
1/4-20 x 0.625” studs on 5/8” centers are provided for installation of customer provided load distribution leads terminated in 2-hole
lugs. Refer to Figure 4.3.
ALERT!
Observe correct polarity when making connections. Otherwise equipment damage may occur.
Procedure
1.
For load connections to the distribution bus row, refer to Figure 4.3.
Figure 4.3: Load Connections to Distribution Bus Row
Load Distribution Connections
* 1/4-20 x 0.625” studs on 5/8” centers
for installation of leads with 2-hole lugs.
* Maximum lug width 0.625”.
* Torque to 58 in-lbs.
-48VDC
Return
Front
Front
Components removed in
illustration for clarity only.
Load
Distribution
Leads Enter
Here (break
tabs off shield
as required)
P/N 545405
P/N 545404
P/N 545571
Top Cover Removed in
Illustration for Clarity Only
Optional Busbar Adapters
584622100 / 584622200 shown.
584622300 / 584622400 similar.