Vertiv™ NetSure™ +24 VDC to -48 VDC Converter System Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
2
1.2
Installation Acceptance Checklist
Provided below is an Installation Acceptance Checklist. This checklist helps ensure proper installation and initial operation of the
system. As the procedures presented in this document are completed, check the appropriate box on this list. If the procedure is not
required to be performed for your installation site, also check the box in this list to indicate that the procedure was read. When
installation is done, ensure that each block in this list has been checked. Some of these procedures may have been factory performed
for you.
NOTE!
The system is not powered up until the end of this checklist.
NOTE!
Some of these procedures may have been factory performed.
Installing the System
Optional Wiring Access Panel Installed on Top of Shelf(s), if desired
Main Shelf Secured to Relay Rack
Expansion Shelf(s) Secured to Relay Rack (if furnished)
and Expansion Wiring Cover installed on Main Shelf
Optional Lug Adapter Busbar Kits Installed
Bullet Nose Circuit Breakers Installed
Bullet Nose Fuseholders and TPS/TLS Fuses Installed
Optional Bullet Nose GMT Fuse Block Installed (if furnished)
Setting Jumper and Switch Options
Jumper on System Interface Circuit Card Set
Switches on System Interface Circuit Card Set
Making Electrical Connections
Shelf(s) Grounding (Frame Ground) Connection Made
External Alarm, Reference, Monitoring, and Control Connections Made
Load Connections Made
Expansion Shelf(s) Interconnections Made (if furnished)
DC Input Connections Made
Installing the Converter Modules and Initially Starting the System
Converter Modules Installed
System Started and Checked