10
10
3-90-30007474
Vermont Castings • Intrepid DV-IFT Owner’s Manual_R20 • 11/21
Your stove is approved to be vented either through the side
wall, or vertical through the roof.
•
HHT does not require any opening for inspection of vent
pipe.
•
Only HHT SLP venting components or DuraVent venting
components specifically approved and labeled for this
stove may be used.
• Maintain minimum clearances between vent pipes and
combustible materials.
•
Venting terminals shall not be recessed into a wall or
siding.
• Any horizontal run must have a 1/4” rise for every one (1)
foot of run towards the vent termination. Never run the
vent level or down.
There must not be any
obstruction such as bushes, garden
sheds, fences, decks or utility buildings within 24" from the
front of the termination hood.
Do not locate termination hood where excessive snow or ice
build up may occur. Be sure to check vent termination area
after snow falls, and clear to prevent accidental blockage of
venting system. When using snow blowers, make sure snow
is not directed towards vent termination area.
Location of Vent Termination
It is imperative the vent termination be located observing the
minimum clearances as shown in this manual.