59
VII. Venting
H. Assembly of Centrotherm InnoFlue Vent Systems
H. Assembly of Centrotherm InnoFlue Vent Systems
1.
This boiler has been approved for use with the Centrotherm InnoFlue single wall PolyPropylene vent system to be provided
by the installer.
WARNING
Asphyxiation Hazard. Follow these instructions and the installation instructions included by the
original PolyPropylene venting component manufacturers, Centrotherm. Failure to do so could cause
products of combustion to enter the building, resulting in severe property damage, personal injury
or death. Where a conflict arises between Centrotherm instructions and these instructions, the more
restrictive instructions shall govern.
Do not mix vent components or joining methods for listed manufacturers.
Examine all components for possible shipping damage prior to installation.
All condensate that forms in the vent must be able to drain back to the boiler.
2. Assemble the vent system, starting at the boiler:
a. The vent adaptor has two different inside diameters. The smaller, lower, inside diameter accepts 3" nominal InnoFlue
(Figure 7.26). Lubricate the upper gasket in the vent adaptor with water and insert the first piece of 3" InnoFlue into the
adaptor until it bottoms out. Tighten Clamp on vent adapter to secure vent pipe.
b. If 2" InnoFlue is to be used for the vent system, reduce the first piece of 3" InnoFlue installed in Step (a) to 2" using
Centrotherm # ISRD0302. Otherwise assemble the next piece of 3" InnoFlue.
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with
Centrocerin # IACE50. Slide a connector ring over the male end of the pipe to be joined as shown in Figure 7.43. Push
the male end of the next section of pipe into the bell until it bottoms out, then back out 1/4" to provide room for thermal
expansion. Push hook on connecting ring over the bell end of the first section of pipe as shown in Figure 7.43.
d. Assemble the rest of the vent system per the manufacturer’s installation instructions, being sure to pitch horizontal
sections back towards the boiler 5/8"/ft.
e. Support each horizontal pipe section with a minimum of one wall strap each and at intervals not exceeding 39in.
Figure 7.43: InnoFlue Connector Ring Installation
Содержание Raptor RPTR155
Страница 1: ...1 ...
Страница 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 14: ...14 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting V Mounting The Boiler continued ...
Страница 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 88: ...88 X Wiring continued ...
Страница 97: ...97 Operating Instructions XI Start Up and Checkout continued ...
Страница 142: ...142 XV Repair Parts continued 3A 3B 3C 3D 3F 3E 3G 3H 3O 3P 3Q 3R 3J 3K 3I 3M 3N 3L All Models ...
Страница 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models ...
Страница 172: ...172 ...