VII. Venting
F. Assembly of DuraVent PolyPro Vent Systems (continued)
8.
Installations using PolyPro-flex (Vent Options 18,19,33,34)
:
WARNING
Asphyxiation Hazard.
When using PolyPro flex, observe the following precautions:
•
PolyPro flex may be damaged by handling at low temperatures. Do not bend, uncoil, or attempt to install
if it has been stored at a temperature below 42°F without allowing it to warm to a higher temperature
first.
•
Do not bend PolyPro flex more than 45°.
• Instructions below reference the DuraVent PolyPro Flex instruction manual. Not all vent
configurations shown in the DuraVent manual are approved for use with this boiler.
Refer to DuraVent PolyPro flex Instructions for assembly of all flex components including the chimney cap and the adaptor
to rigid PolyPro at the base of the masonry or B vent chimney. In addition, observe the following requirements:
a. Refer to the appropriate Vent option in Tables 7.13b or 7.21 for a list of the principle flex components required. Rigid
vent pipe by the same manufacturer will also be required for the run from the boiler to the base of chimney.
b. Masonry chimneys cannot be used for an air chase
c. B vent chimneys can only be used for an air chase (Vent options 18, 19) if the B vent has the minimum size shown in
Table 7.13b and is fully accessible for sealing of all joints and seams.
d. When Vent Option 18 or 19 is used, install a Tee on the base of the B-vent that is the same size as the B- Vent chimney.
Install the PolyPro Lower B–Vent adaptor in the base of this Tee as described in the DuraVent PolyPro Flex instructions.
Connection of the PVC air intake pipe to the side outlet of the tee is made using a cap and a PVC socket x male thread
adaptor (2" or 3", depending on the Vent Option). Cut a clearance hole in the cap for the male threads. Secure the
adaptor to the cap using a 2" or 3" electrical conduit lock nut. Seal all joints with RTV.
G. Assembly of Selkirk Polyflue Vent Systems
WARNING
Asphyxiation Hazard.
When using PolyPro flex, observe the following precautions:
•
PolyPro flex may be damaged by handling at low temperatures. Do not bend, uncoil, or attempt to install
if it has been stored at a temperature below 42°F without allowing it to warm to a higher temperature
first.
•
Do not bend PolyPro flex more than 45°.
• Instructions below reference the DuraVent PolyPro Flex instruction manual. Not all vent
configurations shown in the DuraVent manual are approved for use with this boiler.
1. This boiler has been approved for use with the Selkirk Polyflue single wall PolyPropylene vent system to be provided by the
installer.
2. Assemble the vent system, starting at the boiler:
a. The vent adaptor has two different inside diameters. The smaller, lower, inside diameter accepts 3" nominal Polyflue
(Figure 7.26). Lubricate the upper gasket in the vent adaptor with mild soapy water and insert the first piece of 3"
Polyflue into the adaptor until it bottoms out. Tighten clamp on vent adapter to secure vent pipe.
b. If 2" Polyflue is to be used for the vent system, reduce the first piece of 3" Polyflue installed in Step (a) to 2" using
Selkirk #3PF-3R2. Otherwise assemble the next piece of 3" Polyflue.
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with mild
soapy water. Slide a Pipe Locking Band over the male end of the pipe to be joined as shown in Figure 7.40. Push the
male end of the next section of pipe into the bell until it bottoms out, then back out 1/8—1/4" to provide room for
thermal expansion. Slide pipe locking band over the female end of the connections and tighten both hose clamps.
d. Assemble the rest of the vent system per the manufacturer’s installation instructions, being sure to pitch horizontal
sections back towards the boiler 5/8" per ft.
Содержание Raptor RPTR155
Страница 1: ...1 ...
Страница 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 14: ...14 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting V Mounting The Boiler continued ...
Страница 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 88: ...88 X Wiring continued ...
Страница 97: ...97 Operating Instructions XI Start Up and Checkout continued ...
Страница 142: ...142 XV Repair Parts continued 3A 3B 3C 3D 3F 3E 3G 3H 3O 3P 3Q 3R 3J 3K 3I 3M 3N 3L All Models ...
Страница 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models ...
Страница 172: ...172 ...