161
Appendix C - (continued)
IMPORTANT INFORMATION - READ CAREFULLY
NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the
installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction
shall be consulted before installations are made.
All wiring on boilers installed in the USA shall be made in accordance with the National Electrical Code and/or local
regulations.
Содержание Raptor RPTR155
Страница 1: ...1 ...
Страница 13: ...13 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 14: ...14 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting V Mounting The Boiler continued ...
Страница 87: ...87 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 88: ...88 X Wiring continued ...
Страница 97: ...97 Operating Instructions XI Start Up and Checkout continued ...
Страница 142: ...142 XV Repair Parts continued 3A 3B 3C 3D 3F 3E 3G 3H 3O 3P 3Q 3R 3J 3K 3I 3M 3N 3L All Models ...
Страница 148: ...148 XV Repair Parts continued 6D 6B 6A 6E 6I 6G 6L 6N 6H 6C 6K 6M 6C 6C 6J 6J 6F All Models ...
Страница 172: ...172 ...