General Instructions
Operations sequence
44
cpg.1
Fully SF6 gas insulated single and double busbar GIS switchgears up to 36 kV in accordance
with IEC Standards
IG-137-EN version 03; 24/06/2016
7.4.1 Connection
1. Connect the right feeder disconnector by turning the
lever clockwise.
Figure 7.21
Lever turn detail
2. Then connect the left feeder disconnector by turning
the lever clockwise.
Figure 7.22
Lever turn detail
To put the equipment out of commission,
reverse the sequence of operation.
7.4.2 Earthing
Initial conditions
: feeder disconnectors open
and earthing switches open.
Figure 7.23
Initial situation for
cpg.1-s2
cubicle
1. Connect the right earthing switch by turning the lever
clockwise.
Figure 7.24
Lever turn detail