Operations sequence
General instructions
45
cpg
.1
Fully SF6 gas insulated single and double busbar GIS switchgears up to 36 kV in accordance
with IEC Standards
IG-137-EN version 03; 24/06/2016
2. Then connect the left earthing switch by turning the
lever clockwise.
Figure 7.25
Lever turn detail
To open the earthing switches, proceed in
reverse order.
7.5
cpg.1-c
cubicle
Figure 7.26
Initial situation for
cpg.1-c
cubicle
Содержание Ormazabal cpg.1 Series
Страница 67: ......