TLS Magnetostrictive Probes International Installation Guide
Field Wiring
21
3.
Make the connections using wire nuts [Figure 3]. Cut off the bare shield wire at the cable jacket.
Figure 20. Splice Connections
4.
Use the aluminum bonding clamp to hold the cables together (finger tighten, being careful not to damage the
conductor insulation, see Figure 20). This clamp is not intended to make any electrical connections.
5.
Center the splice in the clear plastic sleeve. Assemble the splice closure, making sure the sleeve is fully
inserted into each of the vinyl end caps. Rotate the sleeve cover until both openings line up. Place the splice
on a level surface.
6.
Remove bag of “Sealing compound” from foil package. Grasp the ends, one in each hand, then pull sharply to
remove plastic clip [Figure 21].
WARNING!
Vapor and liquid may cause sensitization Contains isocyanate. May be
irritating to the eyes. Avoid skin and eye contact. Avoid repeated and
prolonged breathing of vapor. Use only in well ventilated areas.
Inhalation - provide fresh air. In case of eye contact flush eyes with plenty of
water for 10 minutes and get medical attention. If ingested do not induce
vomiting. Get medical attention. Wash with soap and water in case of skin
contact.
C
ab
le from TL
S
Bl
a
ck (–) p
a
ir
Al
u
min
u
m
b
onding cl
a
mp
White (+) p
a
ir
Enclo
su
re
s
leeve
B
a
re dr
a
in wire (c
u
t
ba
ck to
c
ab
le j
a
cket)
C
ab
le from pro
b
e
0
3
1-16
Содержание TLS
Страница 1: ...TLS Magnetostrictive Probes Manual No 577014 031 Revision C International Installation Instructions...
Страница 30: ...Example Isokeraunic Map from IEC Lightning Risk Assessment Tool Germany...
Страница 31: ...For technical support sales or other assistance please visit www veeder com...