TLS Magnetostrictive Probes International Installation Guide

Field Wiring

22

Figure 21.   Removing Sealing Compound Clip 

7.

Thoroughly mix compound together. Invert bag several times while squeezing compound from one end to the 
other for a minimum of one minute.

8.

Once the mixture feels warm, immediately cut one corner and slowly fill the plastic sleeve. Stop just short of 
filling the entire sleeve. 

Do not overfill

. [Figure 22]  

Figure 22.   Pouring Sealing Compound Into Sleeve

9.

With a twisting motion, rotate the outer clear plastic barrel to close the pouring slot.

10. Wait at least five minutes, then use the large cable tie to mount the splice to the riser pipe or probe canister as 

applicable (see Figure 23). 

Содержание TLS

Страница 1: ...TLS Magnetostrictive Probes Manual No 577014 031 Revision C International Installation Instructions...

Страница 2: ...may be subject to change without notice This publication contains proprietary information which is protected by copyright All rights reserved No part of this publication may be photocopied reproduced...

Страница 3: ...ction Gland 10 Probe Installation Access Chamber Installation 11 General 11 Provision for Probe Risers 12 Probe and Riser Installation Criteria 13 Probe Installation Using Process Connection 14 Determ...

Страница 4: ...imensions Needed To Calculate Custom Probes And Risers 15 Figure 16 Veeder Root Riser Cap Assemblies 17 Figure 17 Example Probe Canister Sleeve Adapter Assembly 18 Figure 18 Connection Diagram For A M...

Страница 5: ...ll Veeder Root systems have been designed for ease of operation System consoles have liquid crystal display screens and one touch function keys to guide the user through all operating functions The st...

Страница 6: ...ive 94 9 EC ATEX and the IECEx scheme The installer must consider any local regulations which may differ or be more stringent prior to installing any equipment The suitability safety of any installati...

Страница 7: ...etostrictive probe housing complies with the 500 volt electrical strength requirements in IEC EN 60079 11 In addition the probe housing provides an electrostatic dissipative path to the zener diode ba...

Страница 8: ...e potential of static discharge When fitting or removing the unit use of anti static footwear clothing is required 3 The enclosure contains aluminum Care must be taken to avoid ignition hazards due to...

Страница 9: ...or installing Mag Probes into storage tanks using a tube gland NOTE Use a tube gland in locations where it is mandatory that the Mag Probe be equipotentially bonded to the tank structure Install the M...

Страница 10: ...number 848100 001 according to Figure 25 of this manual Install the Mag Probe with a process connection according to the instructions on Figures 14 and 24 of this manual Riser Pipe Process Connection...

Страница 11: ...o wires connect in the J box or splice kit to the two field wires from the console Product float Product float Water float optional Sleeves 2 Inch Floats Water float optional 1 Inch Floats Adapters Wa...

Страница 12: ...r 4 The cable between the intrinsically safe apparatus in Zone 0 and the surge protection device shall be installed in such a way that it is protected from lightning 5 Any surge protection device intr...

Страница 13: ...w can be supplied by Gilbarco Veeder Root and are included on the manufactures type approval certificates DEMKO 06 ATEX 0508841X and IECEx UL 06 0001X and provide IP67 zone isolation and have been add...

Страница 14: ...igure 9 Mag Probe Process Connection Gland P N 501 000 1206 Shield if required Use fitting tool 705 100 3033 to install or remove the cap 3 inch 76mm BSP riser cap Probe leader cable gland Label Humme...

Страница 15: ...ctor Figure 11 Typical Tank Lid Access Chamber Installation w Surge Protector To allow adequate space for probe installation and servicing it is recommended that the access chamber is a minimum 750mm...

Страница 16: ...0mm radius from its center must be provided See Figure 12 WARNING The probe riser probe riser shall comply with IEC EN 60079 26 and form a suitable process connection across the boundary between zone...

Страница 17: ...anister of the probe must be completely contained within the riser In all cases the probe must rest on the bottom of the tank see Figure 13 Risers when fitted should be a minimum of 100mm above the pr...

Страница 18: ...install the tube gland on the probe shaft near the probe canister Care must be taken to ensure that the probe shaft is not harmed in any way 5 Add the fuel float and the water float then install the p...

Страница 19: ...dd dimensions B C and enter this in column F 3 Select a standard probe length that is equal to or greater than the dimension in column F Enter the standard probe Length in column G Figure 15 Dimension...

Страница 20: ...and enter in column J 4 Calculate the probe clearance J I and enter in column K Column K must be zero or a positive number If the result is a negative number there is insufficient clearance for the pr...

Страница 21: ...nominal bore riser using an appropriate thread sealing compound Reducers are available for 4 inch 102mm nominal bore sockets If the probes are not to be installed immediately cap the riser Where loca...

Страница 22: ...example probe sleeve adapter assembly instructions Figure 17 Example Probe Canister Sleeve Adapter Assembly Probe canister Up Probe shaft Settings for 3 Riser Settings for 4 Riser Fit adapters at each...

Страница 23: ...cally Safe ground INV Tank 1 Tank 2 Tank 3 ShieldedTwo Core Cable for intrinsically safe wiring StorageTank Vapours Tank Structure Cable Bushing Probe Riser Pipe with Cap Magnetostrictive Probe Enclos...

Страница 24: ...y and permanently labelled with the tank number Failure to correctly mark probe field wiring may lead to re work delays in system installation and additional charges MAXIMUM CABLE LENGTHS A maximum of...

Страница 25: ...until both openings line up Place the splice on a level surface 6 Remove bag of Sealing compound from foil package Grasp the ends one in each hand then pull sharply to remove plastic clip Figure 21 W...

Страница 26: ...minute 8 Once the mixture feels warm immediately cut one corner and slowly fill the plastic sleeve Stop just short of filling the entire sleeve Do not overfill Figure 22 Figure 22 Pouring Sealing Com...

Страница 27: ...le The surge protector is not polarity sensitive so either cable port may be used for the probe leader cable Use the cable port on the opposite side for the wiring coming from the ATG Console Inside t...

Страница 28: ...otector Red battery labels two places Single Channel Surge Protector S P Connection Typical Detail Bond 4 mm2 wire locally to tank Pre installed piping e g Dip Tube Probe cable Process connection Glan...

Страница 29: ...owing categories If yes tick the relevant box The site is in a town village or built up area The site is a large motorway site with no probe cable extending more than 5m beyond the area covered by the...

Страница 30: ...Example Isokeraunic Map from IEC Lightning Risk Assessment Tool Germany...

Страница 31: ...For technical support sales or other assistance please visit www veeder com...

Отзывы: