130
©Vecow RCS-9000F GTX1080 User Manual
Appendix F
F
APPENDIX F : Power Supply Installation
Test Temperature
(based on 95% Humidity)
30ºC
35ºC
40ºC
45ºC
50ºC
55ºC
60ºC
3DMARK 11 (V1.5.5.0)
Resolution
1920 x 1080
Score
X9489 X9465 X9414 X9233 X9014 X8839 X8521
Highest Temperature
77ºC
83ºC
86ºC
92ºC
94ºC
95ºC
95ºC
Power Status
On
PASS
PASS
PASS
PASS
PASS
PASS
PASS
Off
PASS
PASS
PASS
PASS
PASS
PASS
PASS
Testing Equipment
CPU
: Intel
®
Core™ i7-7700
IMB
: RCS-9000F GTX1080
Memory
: MEMXPRO 8GB*2
Содержание RCS-9412F-GTX1080
Страница 75: ...67 HARDWARE INSTALLATION Step 3 Remove two M3x5L screws Push down the PCIe x16 slot lock and remove GTX 1080...
Страница 77: ...69 HARDWARE INSTALLATION Take off the bottom cover Remove three F M3x4 screws on the rear...
Страница 81: ...73 HARDWARE INSTALLATION Sequence 2 Sequence 3...
Страница 82: ...74 HARDWARE INSTALLATION Vecow RCS 9000F GTX1080 User Manual Step 8 Take off the SATA cable...