33
GETTING TO KNOW YOUR RCS-9000F GTX1080
2.2.4 PWR & HDD LED Indicator
Isolated
DIO 2
COM 2
COM 1
DVI-D
DVI-I
|
LAN 2
DP
|
LAN 1
COM 4
COM 3
Isolated
DIO 1
V+ V-
On | Off
DC-IN
IGN
SIM 2
SIM 3
RST
Yellow-HDD LED
: A hard disk/CFast LED. If the LED is on, it indicates that the
system's storage is functional. If it is off, it indicates that the system's storage is
not functional. If it is flashing, it indicates data access activities are in progress.
Green-Power LED
: If the LED is solid green, it indicates that the system is
powered on.
LED Color
Indication
System Status
Yellow
HDD/CFast
• On/Off : Storage status, function or not
• Twinkling : Data transferring
Green
Power
System power status (on/off)
2.2.5 DVI-I Connector
The DVI-I connector on the front panel supports both DVI and VGA display
modes. This connector can output DVI signals. The DVI output mode supports
up to 1920x1200 resolution. The DVI mode is automatically selected according
to the display device connected. You will need a DVI-I cable when connecting to
a display device.
Isolated
DIO 2
COM 2
COM 1
DVI-D
DVI-I
|
LAN 2
DP
|
LAN 1
COM 4
COM 3
Isolated
DIO 1
V+ V-
On | Off
DC-IN
IGN
SIM 2
SIM 3
RST
Содержание RCS-9412F-GTX1080
Страница 75: ...67 HARDWARE INSTALLATION Step 3 Remove two M3x5L screws Push down the PCIe x16 slot lock and remove GTX 1080...
Страница 77: ...69 HARDWARE INSTALLATION Take off the bottom cover Remove three F M3x4 screws on the rear...
Страница 81: ...73 HARDWARE INSTALLATION Sequence 2 Sequence 3...
Страница 82: ...74 HARDWARE INSTALLATION Vecow RCS 9000F GTX1080 User Manual Step 8 Take off the SATA cable...