![vc999 RS420 Скачать руководство пользователя страница 14](http://html2.mh-extra.com/html/vc999/rs420/rs420_maintenance-manual_3674555014.webp)
INSTALLATION
LOADING AREA
•
Using eight (8) M6x25mm socket head screws provided, install the loading area as
shown below.
•
Use Loctite or similar substance when reassembling the machine.
•
Reattach cable straps using M5 socket head screws provided.
•
Remove stainless steel end caps to the forming and sealing station in preparation for
the chain installation.
LEVELING MACHINE
•
Level the machine in machine direction as well as across the die tops in the order
indicated by the numbered arrows in the diagram below.
•
It
is
critical
that each die section be level.
o
This is best achieved by raising the machine slightly with a pallet jack and turning
the feet.
•
Be careful to leave at least 10mm of the feet engaged into the machine for
stability.
•
Never attempt to operate a machine that has not been properly leveled.
o
This could result in damage to the machine.
Содержание RS420
Страница 1: ...MAINTENANCE MANUAL FAX 816 472 1999 PHONE 816 472 8999 TOLL FREE 1 800 235 2829 E MAIL vc999 vc999 com...
Страница 6: ...SECTION 1 SAFETY...
Страница 11: ...SECTION 2 TRANSPORTATION...
Страница 13: ...SECTION 3 INSTALLATION...
Страница 19: ...SECTION 4 INTERFACE TOUCH SCREEN...
Страница 26: ...SECTION 5 MAINTENANCE INSPECTION SCHEDULE...
Страница 39: ...SECTION 6 TROUBLESHOOTING GUIDE...
Страница 55: ...SECTION 7 PNEUMATIC DIAGRAMS...
Страница 73: ...SECTION 8 ELECTRICAL DIAGRAMS...
Страница 91: ...SECTION 9 PARTS LIST ASSEMBLY DRAWINGS...
Страница 148: ...Parts 8 12 Vacuum Valve O Ring Replacement Kit...
Страница 149: ...SECTION 10 DIE ASSEMBLY DRAWINGS...
Страница 156: ...NOTES...
Страница 157: ...NOTES...