
TRANSPORTATION
•
Always lift the forming and sealing stations of the rollstock separately.
•
If the machine is completely assembled, it is necessary to use two forklifts or pallet-
jacks to move the machine.
•
NEVER
lift the machine by the loading or discharge areas; as they will not support
the weight of the machine.
•
Always lift the stations from the back side as shown in the illustration below.
•
Take special care when moving the machine not to damage the film systems.
•
Before moving the machine, remove all external equipment and/or exit conveyors.
•
When lifting the separate stations, be careful not to put stress on the electrical or
pneumatic lines that connect the two stations.
•
The maximum separation of the stations during this process should be no more than
the loading area length (see specifications).
Содержание RS420
Страница 1: ...MAINTENANCE MANUAL FAX 816 472 1999 PHONE 816 472 8999 TOLL FREE 1 800 235 2829 E MAIL vc999 vc999 com...
Страница 6: ...SECTION 1 SAFETY...
Страница 11: ...SECTION 2 TRANSPORTATION...
Страница 13: ...SECTION 3 INSTALLATION...
Страница 19: ...SECTION 4 INTERFACE TOUCH SCREEN...
Страница 26: ...SECTION 5 MAINTENANCE INSPECTION SCHEDULE...
Страница 39: ...SECTION 6 TROUBLESHOOTING GUIDE...
Страница 55: ...SECTION 7 PNEUMATIC DIAGRAMS...
Страница 73: ...SECTION 8 ELECTRICAL DIAGRAMS...
Страница 91: ...SECTION 9 PARTS LIST ASSEMBLY DRAWINGS...
Страница 148: ...Parts 8 12 Vacuum Valve O Ring Replacement Kit...
Страница 149: ...SECTION 10 DIE ASSEMBLY DRAWINGS...
Страница 156: ...NOTES...
Страница 157: ...NOTES...