Vaporless ISM-4080 Скачать руководство пользователя страница 21

21 

 

 

(

Содержание ISM-4080

Страница 1: ...1 Quality Petroleum Equipment Solutions for Over 30 Years ISM 4080 Electro Mechanical Line Leak Detection Installation Operation Manual Rev 11 11 2020...

Страница 2: ...es 3GPH line leak detection To alleviate this issue the ISM 4080 will authorize one pump first allow one leak detector to search for a line leak and then after the line has been cleared passed start t...

Страница 3: ...gn characteristics that minimize the effects of poor main grounds and transient noise However good design may not overcome all of the problems of a poorly grounded site or a site with a high amount of...

Страница 4: ...become the tank monitor s authorizations In this manner the pump starting and stopping is subject to the site sensors Alternatively Sump Alarms and E stop can be wired to break main power to the ISM...

Страница 5: ...am found on page 22 connect the IS wiring in the junction box using the supplied wire nuts and di electric grease Use the wiring instructions found on page 22 for the connection to the ISM 4080 contro...

Страница 6: ...s run in response to low pressure completes with a pass An Alarm is initiated at a failure to pressurize the line mechanical electronic problem or due to a 3 GPH line leak FRONT PANEL The ISM 4080 Con...

Страница 7: ...iscussed below TEST Test button not active on the ISM 4080 system PRINT Print button not active on the ISM 4080 system RESET This button is VERY IMPORTANT WILL RESET ALARMS RESTART PUMP S o EXAMPLE If...

Страница 8: ...next If the unit is configured the boot screen will display for about 10 seconds and then move to the Home Screen The home screen will look something like this P 1 T 1L PRES HI MONITOR AL N This scre...

Страница 9: ...system Push ENTER NUM SUCTION CV 0 is the default only used for commercial suction PRODUCT 1 0 pumps Push ENTER NUM PRESSURE CV 0 is the default If controlling transition valves PRODUCT 1 0 enter app...

Страница 10: ...change the values displayed below unless you have consulted with VMI Push ENTER REPRESS TIME MIN Use the UP and DOWN ARROWS to adjust the PRODUCT 1 __ _ value between 0 and 20 minutes Push ENTER DELAY...

Страница 11: ...to adjust the number of repressurization attempts before alarm output Factory default is 1 Push ENTER ALARM ACTION CONFIGURED AT THE FACTORY DO NOT MODIFY Push MENU SET DATE TIME Push ENTER SET DATE U...

Страница 12: ...DETAILS If your site has optional sump sensors integrated into the ISM 4080 System When the presence of liquid is detected by the sump sensor the system will not allow the turbine to operate in the s...

Страница 13: ...ocedure must be repeated for each product CAUTION Eye protection required during the calibration and testing process 1 Disable ISM Repressure Cycle With power applied to the ISM disable repressurizati...

Страница 14: ...of fuel stopped empty the collection beaker 12 With the small 250 ml beaker under the LDT 890 discharge port carefully move the selector to the DISPENSER NOZZLE position Fuel will begin to flow into t...

Страница 15: ...eled CALIBRATE PRESSURE Adjust the pressure on the left hand pressure gauge to 10 psi 5 Using the small beaker 250 ml collect a sample of fuel over a 30 second interval If the volume is not 95 ml on t...

Страница 16: ...the dispenser authorized the pump will start running Again note that with the selector in the GPH TEST position a 3 gph leak has been introduced to the system Watch the right hand pressure gauge as t...

Страница 17: ...rted 16 At the end of the delay timing cycle the ISM will automatically turn on the pump Pressure will begin to build but will stop at the value observed in Step 10 indicating that the leak detector h...

Страница 18: ...Turbine Output 4 Control Valve Outputs BROWN Control Valve Output 1 RED Control Valve Output 2 Alarm Outputs YELLOW Alarm Output 1 ORANGE Alarm Output 2 IS SWITCH I O TERMINALS IS switch wiring connec...

Страница 19: ...19...

Страница 20: ...Sump Alarm Output 1 RED Alarm Sump Alarm Output 2 ORANGE Alarm Sump Alarm Output 3 YELLOW Alarm Sump Alarm Output 4 IS SWITCH I O TERMINALS IS switch wiring connections are to be made using low capaci...

Страница 21: ...21...

Страница 22: ...22 Piston Switch Wiring Detail Without Sump Sensor...

Страница 23: ...mp Sensor The Piston Switch may share the wire pair from single point sump sensor with a 100k resistor such as Veeder Root p n VR794380 208 If the MLLD Piston Switch es are to be installed in series w...

Страница 24: ...ufactured by Vaporless Manufacturing Inc Electronics Division 8700 East Long Mesa Drive Prescott Valley Arizona 86314 Phone 928 775 5191 Website www vaporless com Technical Support electronics vaporle...

Отзывы: