8. Read Operating Pressure 

Authorize the dispenser. The pump will start running. Watch for the pump to achieve operating pressure 
as seen on the right-hand pressure gauge. Note this pressure reading on the LDT-890 Test form and then 
remove the authorization from the dispenser. 
 

9. Reduce Line Pressure to Zero 

With the large beaker under the discharge port, set the test unit’s selector to the DISPENSER NOZZLE 
position. Fuel will begin to flow into the beaker. After the reading on the right-hand pressure gauge falls 
to zero, set the test unit’s selector to the GPH TEST position and authorize the dispenser. 

 
10. 3 GPH Leak Detector Test 

With the dispenser authorized, the pump will start running. With the selector in the GPH TEST position a 
3 GPH leak has been introduced to the system. On the right-hand pressure gauge watch for the pump to 
build pressure. If the mechanical leak detector is properly calibrated this pressure should not reach the 
normal  operating  pressure  previously  observed.  Note  this  lower  pressure  value  here.  Remove  the 
authorization from the dispenser. 
 

11. Reduce Line Pressure to Zero  

Set  the  test  unit’s  selector  to  the  DISPENSER  NOZZLE  position.  Fuel  will  continue  to  flow  into  the 
beaker. After the reading on the right-hand pressure gauge falls to zero, set the selector to the GPH TEST 
position and again authorize the dispenser. 
 

12. Leak Test Confirmation 

With the dispenser authorized, the pump will start running. Again, note that with the selector in the GPH 
TEST position a 3 gph leak has been introduced to the system. Watch the right-hand pressure gauge as the 
pump builds pressure. The pressure should build to the value noted in Step 10.  
 

TECHNICAL NOTE

 — If on either test, the pressure indicated on the right-hand pressure gauge does 

not stabilize at the lower pressure, but rather steps through to the higher normal operating value, the leak 
detector has failed the leak test. Adjust the LD-2000 or LD-3000 to detect a leak consistently.  The VMI 
Piston Switch will have to be removed to complete this adjustment. Contact VMI for LD-2000 or LD-
3000 adjustment instructions if needed.  
 
After the LD-2000 or LD-3000 has been properly adjusted to detect the leak, and the Piston Switch has 
been  reinstalled,  turn  the  selector  to  the  PRESSURE  STEP  TEST  position.  Reauthorize  the  pump. 
Following a short delay, the pressure should step up to the value noted in Step 8. This is the indication that 
the mechanical leak detector has properly transferred from its leak test position to its full flow position. 
 

13. Auto-Repressure Test 

Remove the dispenser authorization. With the large beaker under the discharge port, set the selector to the 
DISPENSER  NOZZLE  position.  Fuel  will  flow  into  the  beaker. After  the  reading  on  the  right-hand 
pressure gauge falls to zero, set the selector to the PRESSURE STEP TEST position.  

 
14. 

Re-Enable Repressurization Feature by adjusting REPRESSURE DISABLE END TIME from 23 to 

00, the original time setting (reference page 10 above). 
 

Содержание ISM-4080

Страница 1: ...1 Quality Petroleum Equipment Solutions for Over 30 Years ISM 4080 Electro Mechanical Line Leak Detection Installation Operation Manual Rev 11 11 2020...

Страница 2: ...es 3GPH line leak detection To alleviate this issue the ISM 4080 will authorize one pump first allow one leak detector to search for a line leak and then after the line has been cleared passed start t...

Страница 3: ...gn characteristics that minimize the effects of poor main grounds and transient noise However good design may not overcome all of the problems of a poorly grounded site or a site with a high amount of...

Страница 4: ...become the tank monitor s authorizations In this manner the pump starting and stopping is subject to the site sensors Alternatively Sump Alarms and E stop can be wired to break main power to the ISM...

Страница 5: ...am found on page 22 connect the IS wiring in the junction box using the supplied wire nuts and di electric grease Use the wiring instructions found on page 22 for the connection to the ISM 4080 contro...

Страница 6: ...s run in response to low pressure completes with a pass An Alarm is initiated at a failure to pressurize the line mechanical electronic problem or due to a 3 GPH line leak FRONT PANEL The ISM 4080 Con...

Страница 7: ...iscussed below TEST Test button not active on the ISM 4080 system PRINT Print button not active on the ISM 4080 system RESET This button is VERY IMPORTANT WILL RESET ALARMS RESTART PUMP S o EXAMPLE If...

Страница 8: ...next If the unit is configured the boot screen will display for about 10 seconds and then move to the Home Screen The home screen will look something like this P 1 T 1L PRES HI MONITOR AL N This scre...

Страница 9: ...system Push ENTER NUM SUCTION CV 0 is the default only used for commercial suction PRODUCT 1 0 pumps Push ENTER NUM PRESSURE CV 0 is the default If controlling transition valves PRODUCT 1 0 enter app...

Страница 10: ...change the values displayed below unless you have consulted with VMI Push ENTER REPRESS TIME MIN Use the UP and DOWN ARROWS to adjust the PRODUCT 1 __ _ value between 0 and 20 minutes Push ENTER DELAY...

Страница 11: ...to adjust the number of repressurization attempts before alarm output Factory default is 1 Push ENTER ALARM ACTION CONFIGURED AT THE FACTORY DO NOT MODIFY Push MENU SET DATE TIME Push ENTER SET DATE U...

Страница 12: ...DETAILS If your site has optional sump sensors integrated into the ISM 4080 System When the presence of liquid is detected by the sump sensor the system will not allow the turbine to operate in the s...

Страница 13: ...ocedure must be repeated for each product CAUTION Eye protection required during the calibration and testing process 1 Disable ISM Repressure Cycle With power applied to the ISM disable repressurizati...

Страница 14: ...of fuel stopped empty the collection beaker 12 With the small 250 ml beaker under the LDT 890 discharge port carefully move the selector to the DISPENSER NOZZLE position Fuel will begin to flow into t...

Страница 15: ...eled CALIBRATE PRESSURE Adjust the pressure on the left hand pressure gauge to 10 psi 5 Using the small beaker 250 ml collect a sample of fuel over a 30 second interval If the volume is not 95 ml on t...

Страница 16: ...the dispenser authorized the pump will start running Again note that with the selector in the GPH TEST position a 3 gph leak has been introduced to the system Watch the right hand pressure gauge as t...

Страница 17: ...rted 16 At the end of the delay timing cycle the ISM will automatically turn on the pump Pressure will begin to build but will stop at the value observed in Step 10 indicating that the leak detector h...

Страница 18: ...Turbine Output 4 Control Valve Outputs BROWN Control Valve Output 1 RED Control Valve Output 2 Alarm Outputs YELLOW Alarm Output 1 ORANGE Alarm Output 2 IS SWITCH I O TERMINALS IS switch wiring connec...

Страница 19: ...19...

Страница 20: ...Sump Alarm Output 1 RED Alarm Sump Alarm Output 2 ORANGE Alarm Sump Alarm Output 3 YELLOW Alarm Sump Alarm Output 4 IS SWITCH I O TERMINALS IS switch wiring connections are to be made using low capaci...

Страница 21: ...21...

Страница 22: ...22 Piston Switch Wiring Detail Without Sump Sensor...

Страница 23: ...mp Sensor The Piston Switch may share the wire pair from single point sump sensor with a 100k resistor such as Veeder Root p n VR794380 208 If the MLLD Piston Switch es are to be installed in series w...

Страница 24: ...ufactured by Vaporless Manufacturing Inc Electronics Division 8700 East Long Mesa Drive Prescott Valley Arizona 86314 Phone 928 775 5191 Website www vaporless com Technical Support electronics vaporle...

Отзывы: