Vanderbilt
14
A6V10200077_e
Installation Instructions
08.02.2016
5.8
Configure the indicator module
11. Configure the I/P and O/P polarities for the indicator module using the DIP switch.
GMYA7-A
A
– Terminal block X1
B
– Terminal block X2
C
– DIP switch
Test output: Set the polarity using the DIP switch
Active high = 0 V applied
Active low = 0 V removed
Seismic detector
Test = Active low (0 V)
Inverted
Test = Active high
Seismic detector output: Set the polarity using the DIP switch
Active high = 0 V applied
Active low = 0 V removed
Seismic detector
Alarm = Active low (0 V)
Inverted
Alarm = Active high
Non-assigned KSM connections must be
connected to 0 V otherwise an alarm is indi-
cated
12. Enter the relevant details for each connected detector on the inscription template. Slide the inscription temp-
late into the window through the slot from the inside of the cover.
13. Close all indicator modules, then close the key switch module to power up the system for the first time.
14. Carry out initial commissioning as described in the Operation section.
Once successfully commissioned, the remote testing system is operational and can be sealed. We would recom-
mend taking a log of commissioning, using the GMSW7 SensTool software.