
©
GDC Group Ltd. AUG 2016
Page 34
14.4
Install the log set supplied
- Reference the log fitting guide for details how the set must be placed.
14.5
Refit the window door panel, hook the top of the
window door panel onto the top of the inner convector
box. Lower the glass door till it covers fully the opening
of the inner convector box. Screw back into place as
before by hand the two M5 knurled screws in a
clockwise direction just under the base of the window
door frame. These screws only require to be hand
tightened closed.
14.6
Replace the visual baffle, carefully slide back into
place as before the visual baffle. Screw by hand the
two M5 knurled screws in a clockwise direction to
secure it.
15. FULL OPERATING CHECKS
15.1 Check the burner operation.
Repeat the checks conducted in section 13.3.
Please note:
When first turned on from cold, the flames will appear predominantly blue.
When operating the fire for the first time, some vapours may be given off which could
set off smoke alarms in the vicinity. These vapours are quite normal with new
appliances. They are totally harmless and will disappear after a few hours use.
15.2 Check for spillage.
The spillage check must be conducted before fitting the trim.
1.
Close all doors and windows in the room containing the appliance.
2.
Light the appliance and set the control to its highest heat position.
3.
Leave the appliance on for five minutes.
4.
At the top of the heater are two openings. The upper opening has a tapered rear
INSTALLER GUIDE
A spillage check must be made before leaving the installed appliance with the
customer.