background image

 

 

2

CONTENTS 

 

1.

 

SAFETY INFORMATION ........................................................................................................................................................................ 3

 

2.

 

OPTIONS..................................................................................................................................................................................................... 4

 

2.1.

 

Appliance styles .................................................................................................................................................................................. 4

 

2.2.

 

Optional outer trims .......................................................................................................................................................................... 4

 

2.3.

 

Additional optional features ............................................................................................................................................................. 4

 

2.4.

 

Venting options................................................................................................................................................................................... 4

 

3.

 

GENERAL ................................................................................................................................................................................................... 6

 

3.1.

 

Approvals & codes ............................................................................................................................................................................. 6

 

3.2.

 

Ratings................................................................................................................................................................................................. 6

 

3.3.

 

Wall  Thickness .................................................................................................................................................................................. 6

 

4.

 

LOCATION ................................................................................................................................................................................................. 7

 

4.1.

 

Framing ............................................................................................................................................................................................... 7

 

4.2.

 

Rear Vent Connection. Flat on Wall................................................................................................................................................ 7

 

4.3.

 

Rear Vent Connection. Flat on Wall with Snorkel Termination.................................................................................................. 7

 

4.4.

 

Rear Vent Connection, Vertical Vent Rise with Horizontal Rear Termination......................................................................... 8

 

4.5.

 

Rear Vent Connection, Vertical Vent Rise with Horizontal Snorkel Termination.................................................................... 8

 

4.6.

 

Corner Location, Rear Vent Connection, Horizontal Vent Run Only ........................................................................................ 9

 

4.7.

 

Corner Location, Rear Vent Connection, Vertical Rise, Horizontal Termination .................................................................... 9

 

4.8.

 

Rear Vent Connection, Vertical Rise, Through the Roof Termination ....................................................................................... 9

 

4.9.

 

Rear Vent Connection,Vertical Rise with Offset, Through the Roof Termination.................................................................. 10

 

4.10.

 

Top Vent Connection, Horizontal Rear Termination.................................................................................................................. 11

 

4.11.

 

Top Vent Connection, Horizontal side termination ..................................................................................................................... 12

 

4.12.

 

Top Vent Connection, Horizontal Side or Rear Snorkel Termination ...................................................................................... 12

 

4.13.

 

Top Vent Connection, Corner Location, Horizontal Termination, 45° Pipe Run.................................................................... 12

 

4.14.

 

Top Vent Connection, Through the Roof Termination

*

........................................................................................................... 13

 

4.15.

 

Top Vent Connection, Offset and Through the Roof Termination

*

........................................................................................ 13

 

4.16.

 

Vent Location ................................................................................................................................................................................... 14

 

5.

 

SUPPLY GAS ............................................................................................................................................................................................ 15

 

6.

 

PACK CONTENTS .................................................................................................................................................................................. 15

 

7.

 

APPLIANCE PREPARATION............................................................................................................................................................... 17

 

7.1.

 

Window Removal ............................................................................................................................................................................. 17

 

7.2.

 

Ignition Spark Check....................................................................................................................................................................... 17

 

7.3.

 

Flame Control Motor Check........................................................................................................................................................... 17

 

7.4.

 

Rear Vent Outlet positioning .......................................................................................................................................................... 18

 

7.5.

 

# 817VAK Pipe Adapter Fitting ..................................................................................................................................................... 18

 

7.6.

 

Top Heat Shield & Stand-off Fitting.............................................................................................................................................. 19

 

7.7.

 

Support Angle Fitting ...................................................................................................................................................................... 19

 

7.8.

 

Attaching Air Restrictors ................................................................................................................................................................ 20

 

7.9.

 

Attaching Rear Ceramic Support .................................................................................................................................................. 21

 

7.10.

 

Attaching to the Framing ................................................................................................................................................................ 21

 

8.

 

INSTALLATIONS WITH HORIZONTAL TERMINATION – INSTALLING TO WALL.......................................................... 22

 

8.1.

 

Flat On Wall Installations With Valor #551DVK Terminal....................................................................................................... 22

 

8.2.

 

Wall Opening.................................................................................................................................................................................... 23

 

8.3.

 

Valor Terminal #551DVK - Preparing Wall Plates ..................................................................................................................... 23

 

8.4.

 

Dura-vent Terminals – Installing to wall ...................................................................................................................................... 23

 

9.

 

INSTALLATIONS WITH THROUGH THE ROOF VERTICAL TERMINATION ..................................................................... 24

 

10.

 

SWITCH FITTING.................................................................................................................................................................................. 25

 

10.1.

 

For wall switch as only active switch ............................................................................................................................................. 25

 

10.2.

 

For active remote control with or without active wall switch..................................................................................................... 25

 

11.

 

GAS SUPPLY INSTALLATION & AERATION SETTING ............................................................................................................. 26

 

11.1.

 

Gas Supply Installation ................................................................................................................................................................... 26

 

11.2.

 

Aeration Setting Check.................................................................................................................................................................... 26

 

12.

 

CERAMIC FUEL BED INSTALLATION ........................................................................................................................................... 27

 

12.1.

 

Ceramic Walls Installation ............................................................................................................................................................. 27

 

12.2.

 

Ceramic Logs Installation ............................................................................................................................................................... 27

 

13.

 

WINDOW REFITTING & CHECKING .............................................................................................................................................. 28

 

14.

 

OPERATION CHECKS.......................................................................................................................................................................... 28

 

15.

 

FRONT INSTALLATION ...................................................................................................................................................................... 29

 

15.1.

 

Additional Optional 3 or 4 Sided Trims ........................................................................................................................................ 29

 

15.2.

 

#601SFB Standard Metal Front ..................................................................................................................................................... 29

 

15.3.

 

#602CFB Cast Iron Front ............................................................................................................................................................... 29

 

 

 
 
 

Содержание 534AN

Страница 1: ...nt Installation and service must be performed by a qualified installer service agency or the gas supplier This appliance may be installed in an aftermarket permanently located manufactured mobile home...

Страница 2: ...13 4 15 Top Vent Connection Offset and Through the Roof Termination 13 4 16 Vent Location 14 5 SUPPLY GAS 15 6 PACK CONTENTS 15 7 APPLIANCE PREPARATION 17 7 1 Window Removal 17 7 2 Ignition Spark Chec...

Страница 3: ...r flammable vapors and liquids Never attempt to burn paper or any other material in the appliance The venting terminal must not be recessed into a wall or siding The vent terminal on the outside wall...

Страница 4: ...ion in areas where natural gas was not available at the time of initial installation 2 4 Venting options 2 4 1 Direct vent installations One or more of the accessories listed below must be used for ea...

Страница 5: ...clearance B 7 178mm 8 203mm 9 229mm 10 254mm 11 279mm 12 305mm 14 356mm Figure 1 Major dimensions clearances without optional trims Shown with 601SFB Front 3 sided trims 4 sided trims Figure 2 601SFB...

Страница 6: ...These appliances when installed must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian Electrical...

Страница 7: ...K only The horizontal vent run can not be extended by the use of any vent accessory pipes 4 3 Rear Vent Connection Flat on Wall with Snorkel Termination See figure 6 For use on horizontal installation...

Страница 8: ...tical pipe run and at sides of horizontal pipe run 2 5 1cm For installations with a horizontal rear termination the combination of horizontal and vertical vent pipes must be within the allowed area sh...

Страница 9: ...on See figure 10 Adapter 817VAK one 90 vent elbow 990B Dura vent pipe lengths a vertical vent terminal and roof flashing will be required Various other ceiling or roof items may be necessary depending...

Страница 10: ...ng on the particular installation See venting options section of this manual Note 1 The distance from the roof to the lowest terminal discharge opening depends on the roof pitch and must be in accorda...

Страница 11: ...izontal pipe run inside building Outside wall shields thimbles 1 12 7cm G Clearance to combustible materials below horizontal pipe run 15 16 3 3cm H Clearance to combustible materials all round vertic...

Страница 12: ...sional requirements in sections 4 10 and 4 11 apply Adapter 817VAK one 90 vent elbow 990B a Dura vent snorkel termination and Dura vent pipe lengths will be required 942 Dura vent thimble kit may also...

Страница 13: ...vent elbows 945B wall straps a vertical vent terminal roof flashing and Dura vent pipe lengths will be required Various other ceiling or roof items may be necessary depending on the particular install...

Страница 14: ...ensation on window 12 30 D Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 feet 60 cm from the center line of the terminal 18 46 E Clearance to unv...

Страница 15: ...to studding 601SFB Standard metal front Alternative 1 Upper louver unit 1 Lower louver unit 2 Side channels 2 Hinge studs 2 Hinge spacers 2 Magnet counterplates 602CFB Cast iron front Alternative 1 T...

Страница 16: ...16 Figure 19 Pack contents...

Страница 17: ...clockwise through the IGN position to PILOT A spark should flash across from the pilot electrode to the pilot burner shield See figure 21 7 3 Flame Control Motor Check See figure 22 Fit the battery ho...

Страница 18: ...collars to check alignment Tighten the 12 screws to secure the outer collar 6 Fit the cover plate and seal Removed from the rear to the top vent opening with 12 screws 7 5 817VAK Pipe Adapter Fitting...

Страница 19: ...es by refitting the two screws at the top rear corners and by two screws from the pack fitted near the front 6 Bend the two top rear stand offs and fit to the heat shield with three screws each see fi...

Страница 20: ...opening set at Less than 3ft 91cm A Maximum Top From 3ft 91cm to 6ft 183cm A Minimum Less than 3ft 6 107cm A Maximum Horizontal through wall Rear From 3ft 6 107cm to 6ft 183cm A Minimum Less than 20f...

Страница 21: ...ing through two holes each side with the woodscrews supplied The top support angle should abut the wall finish but is not fixed to the framing 3 Check the wall finish requirements with the homeowner I...

Страница 22: ...position e Cut the vent tubes squarely to length f Make sure that all Styrofoam is removed from the vent unit after cutting 2 Free the appliance from the frame studding by removing the four screws ins...

Страница 23: ...tube will pass clearly through the plate with the wall shield at the top Place the inner wall plate over the terminal unit 3 Slide the appliance terminal into the wall Make sure that the drain hole i...

Страница 24: ...through the roof If directly above the position where it penetrates the ceiling drop a plumb from the roof to the small hole in the ceiling and mark the roof at this spot If rafters or other obstructi...

Страница 25: ...ase through the opening at the bottom right side of the heater case 2 Cut off the L terminals from the switch wires on the remote control receiver and remove insulation from approximately at ends of w...

Страница 26: ...the gas supply piping system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than psig 3 5kPa f Failure...

Страница 27: ...behind the burner See figure 50 2 Place the rear log in position locating the two top projections in the ash bed into the holes in the rear log See figure 51 3 Place the two front logs at the front of...

Страница 28: ...nce and all other controls wall switch remote hand unit See owner s lighting instructions further on in this manual for full details Aeration adjustment As described in section 11 for natural gas appl...

Страница 29: ...nit using the hinge studs and hinge spacers as shown in figure 59 2 Fix the two adhesive backed magnet counterplates to the tabs at the firebox sides which line up with the magnets on the lower louver...

Отзывы: