2
CONTENTS
1.
SAFETY INFORMATION ........................................................................................................................................................................ 3
2.
OPTIONS..................................................................................................................................................................................................... 4
2.1.
Appliance styles .................................................................................................................................................................................. 4
2.2.
Optional outer trims .......................................................................................................................................................................... 4
2.3.
Additional optional features ............................................................................................................................................................. 4
2.4.
Venting options................................................................................................................................................................................... 4
3.
GENERAL ................................................................................................................................................................................................... 6
3.1.
Approvals & codes ............................................................................................................................................................................. 6
3.2.
Ratings................................................................................................................................................................................................. 6
3.3.
Wall Thickness .................................................................................................................................................................................. 6
4.
LOCATION ................................................................................................................................................................................................. 7
4.1.
Framing ............................................................................................................................................................................................... 7
4.2.
Rear Vent Connection. Flat on Wall................................................................................................................................................ 7
4.3.
Rear Vent Connection. Flat on Wall with Snorkel Termination.................................................................................................. 7
4.4.
Rear Vent Connection, Vertical Vent Rise with Horizontal Rear Termination......................................................................... 8
4.5.
Rear Vent Connection, Vertical Vent Rise with Horizontal Snorkel Termination.................................................................... 8
4.6.
Corner Location, Rear Vent Connection, Horizontal Vent Run Only ........................................................................................ 9
4.7.
Corner Location, Rear Vent Connection, Vertical Rise, Horizontal Termination .................................................................... 9
4.8.
Rear Vent Connection, Vertical Rise, Through the Roof Termination ....................................................................................... 9
4.9.
Rear Vent Connection,Vertical Rise with Offset, Through the Roof Termination.................................................................. 10
4.10.
Top Vent Connection, Horizontal Rear Termination.................................................................................................................. 11
4.11.
Top Vent Connection, Horizontal side termination ..................................................................................................................... 12
4.12.
Top Vent Connection, Horizontal Side or Rear Snorkel Termination ...................................................................................... 12
4.13.
Top Vent Connection, Corner Location, Horizontal Termination, 45° Pipe Run.................................................................... 12
4.14.
Top Vent Connection, Through the Roof Termination
*
........................................................................................................... 13
4.15.
Top Vent Connection, Offset and Through the Roof Termination
*
........................................................................................ 13
4.16.
Vent Location ................................................................................................................................................................................... 14
5.
SUPPLY GAS ............................................................................................................................................................................................ 15
6.
PACK CONTENTS .................................................................................................................................................................................. 15
7.
APPLIANCE PREPARATION............................................................................................................................................................... 17
7.1.
Window Removal ............................................................................................................................................................................. 17
7.2.
Ignition Spark Check....................................................................................................................................................................... 17
7.3.
Flame Control Motor Check........................................................................................................................................................... 17
7.4.
Rear Vent Outlet positioning .......................................................................................................................................................... 18
7.5.
# 817VAK Pipe Adapter Fitting ..................................................................................................................................................... 18
7.6.
Top Heat Shield & Stand-off Fitting.............................................................................................................................................. 19
7.7.
Support Angle Fitting ...................................................................................................................................................................... 19
7.8.
Attaching Air Restrictors ................................................................................................................................................................ 20
7.9.
Attaching Rear Ceramic Support .................................................................................................................................................. 21
7.10.
Attaching to the Framing ................................................................................................................................................................ 21
8.
INSTALLATIONS WITH HORIZONTAL TERMINATION – INSTALLING TO WALL.......................................................... 22
8.1.
Flat On Wall Installations With Valor #551DVK Terminal....................................................................................................... 22
8.2.
Wall Opening.................................................................................................................................................................................... 23
8.3.
Valor Terminal #551DVK - Preparing Wall Plates ..................................................................................................................... 23
8.4.
Dura-vent Terminals – Installing to wall ...................................................................................................................................... 23
9.
INSTALLATIONS WITH THROUGH THE ROOF VERTICAL TERMINATION ..................................................................... 24
10.
SWITCH FITTING.................................................................................................................................................................................. 25
10.1.
For wall switch as only active switch ............................................................................................................................................. 25
10.2.
For active remote control with or without active wall switch..................................................................................................... 25
11.
GAS SUPPLY INSTALLATION & AERATION SETTING ............................................................................................................. 26
11.1.
Gas Supply Installation ................................................................................................................................................................... 26
11.2.
Aeration Setting Check.................................................................................................................................................................... 26
12.
CERAMIC FUEL BED INSTALLATION ........................................................................................................................................... 27
12.1.
Ceramic Walls Installation ............................................................................................................................................................. 27
12.2.
Ceramic Logs Installation ............................................................................................................................................................... 27
13.
WINDOW REFITTING & CHECKING .............................................................................................................................................. 28
14.
OPERATION CHECKS.......................................................................................................................................................................... 28
15.
FRONT INSTALLATION ...................................................................................................................................................................... 29
15.1.
Additional Optional 3 or 4 Sided Trims ........................................................................................................................................ 29
15.2.
#601SFB Standard Metal Front ..................................................................................................................................................... 29
15.3.
#602CFB Cast Iron Front ............................................................................................................................................................... 29
Содержание 534AN
Страница 16: ...16 Figure 19 Pack contents...