background image

 

FP1LM

 

Manoir

 ‐ 

Installation

 

and

 

Operation

 

Manual

 

43

 

2.2

 

Operating

 

the

 

FP1LM

 

Manoir

 

Wood

 

Fireplace

 

CAUTION:

 

WHEN

 

USING

 

THE

 

DECORATIVE

 

APPLIANCE,

 

THE

 

FIREPLACE

 

DAMPER

 

MUST

 

BE

 

SET

 

IN

 

THE

 

FULLY

 

OPEN

 

POSITION.

 

2.2.1

 

First

 

Fires

 

Two

 

things

 

will

 

happen

 

as

 

you

 

burn

 

your

 

first

 

few

 

fires;

 

the

 

paint

 

cures

 

and

 

the

 

internal

 

components

 

of

 

the

 

fireplace

 

are

 

conditioned.

  

As

 

the

 

paint

 

cures,

 

some

 

of

 

the

 

chemicals

 

vaporize.

 

The

 

vapors

 

are

 

not

 

poisonous,

 

but

 

they

 

do

 

smell

 

bad.

 

Fresh

 

paint

 

fumes

 

can

 

also

 

cause

 

false

 

alarms

 

in

 

smoke

 

detectors.

 

So,

 

when

 

you

 

first

 

light

 

your

 

fireplace,

 

be

 

prepared

 

by

 

opening

 

doors

 

and/or

 

windows

 

to

 

ventilate

 

the

 

house.

 

As

 

you

 

burn

 

hotter

 

and

 

hotter

 

fires,

 

more

 

of

 

the

 

painted

 

surfaces

 

reach

 

the

 

curing

 

temperature

 

of

 

the

 

paint.

 

The

 

smell

 

of

 

curing

 

paint

 

does

 

not

 

disappear

 

until

 

you

 

have

 

burned

 

one

 

or

 

two

 

very

 

hot

 

fires.

  

Burn

 

one

 

or

 

two

 

small

 

fires

 

to

 

begin

 

the

 

curing

 

and

 

conditioning

 

process.

 

Then

 

build

 

bigger

 

and

 

hotter

 

fires

 

until

 

there

 

is

 

no

 

longer

 

any

 

paint

 

smell

 

from

 

the

 

fireplace.

 

Once

 

the

 

paint

 

smell

 

disappears,

 

your

 

fireplace

 

is

 

ready

 

for

 

serious

 

heating.

 

2.2.2

 

Building

 

a

 

Fire

 

To

 

start

 

a

 

fire,

 

place

 

several

 

crumpled

 

up

 

balls

 

of

 

newspaper

 

in

 

the

 

firebox

 

behind

 

the

 

andiron.

 

Place

 

small

 

dry

 

pieces

 

of

 

kindling

 

on

 

top

 

of

 

the

 

paper,

 

criss

crossing

 

the

 

kindling

 

so

 

that

 

there

 

are

 

air

 

spaces

 

in

 

between.

 

Open

 

the

 

exhaust

 

damper

 

fully

 

and

 

light

 

the

 

newspaper.

 

Once

 

the

 

newspaper

 

and

 

the

 

kindling

 

are

 

well

 

ignited,

 

you

 

may

 

close

 

the

 

glass

 

door

 

for

 

a

 

few

 

minutes

 

so

 

that

 

the

 

firebox

 

and

 

chimney

 

of

 

your

 

fireplace

 

can

 

heat

 

up

 

enough

 

for

 

optimal

 

operation.

 

When

 

this

 

heating

 

period

 

is

 

done

 

and

 

the

 

kindling

 

fire

 

is

 

well

 

established,

 

you

 

can

 

operate

 

the

 

fireplace

 

with

 

the

 

firescreen

 

or

 

the

 

glass

 

door

 

depending

 

on

 

your

 

preference

 

and

 

add

 

cordwood

 

as

 

needed.

 

The

 

unit

 

will

 

burn

 

best

 

with

 

2

3

 

pieces

 

of

 

cordwood

 

spaced

 

1

 

to

 

2

 

inches

 

apart

 

and

 

allowing

 

air

 

to

 

get

 

under

 

the

 

fuel.

 

Criss

crossing

 

or

 

arranging

 

the

 

fuel

 

so

 

that

 

air

 

can

 

get

 

underneath,

 

will

 

help

 

the

 

fire

 

to

 

get

 

started

 

easily.

 

CAUTION:

 

THE

 

EXHAUST

 

DAMPER

 

AND

 

THE

 

AIR

 

INTAKE

 

CONTROL

 

MUST

 

BE

 

KEPT

 

FULLY

 

OPEN

 

UNTIL

 

THE

 

FIREPLACE

 

HAS

 

COOLED

 

DOWN

 

FOR

 

A

 

FEW

 

HOURS.

 

WARNING:

 

NEVER

 

PUT

 

CORDWOOD

 

IN

 

FRONT

 

OF

 

THE

 

ANDIRONS.

 

2.2.3

 

Maintaining

 

the

 

Fire

 

Once

 

the

 

wood

 

has

 

been

 

consumed

 

(or

 

partially

 

consumed)

 

and

 

you

 

have

 

obtained

 

a

 

good

 

bed

 

of

 

embers,

 

you

 

should

 

reload

 

the

 

unit.

 

In

 

order

 

to

 

do

 

so,

 

proceed

 

by

 

opening

 

the

 

glass

 

door

 

or

 

the

 

screen

 

door

 

for

 

you

 

to

 

have

 

enough

 

free

 

space

 

to

 

reload

 

safely.

 

 

Your

 

FP1LM

 

MANOIR

 

wood

 

fireplace

 

will

 

work

 

best

 

if

 

a

 

thick

 

bed

 

of

 

hot

 

embers

 

is

 

maintained

 

in

 

the

 

bottom

 

of

 

the

 

firebox

 

and

 

a

 

minimum

 

of

 

two

 

large

 

pieces

 

of

 

seasoned

 

fuel

 

are

 

added.

   

Combustion

 

efficiency

 

is

 

largely

 

related

 

to

 

establishing

 

a

 

hot

 

ember

 

bed,

 

and

 

hot

 

firebox

 

temperatures.

 

The

 

quicker

 

the

 

fireplace

 

and

 

chimney

 

(flue)

 

get

 

up

 

to

 

normal

 

operating

 

temperatures,

 

the

 

better.

  

Use

 

a

 

poker

 

to

 

make

 

an

 

air

 

channel

 

in

 

the

 

embers

 

below

 

the

 

wood.

 

This

 

will

 

allow

 

air

 

to

 

flow

 

under

 

the

 

wood

 

for

 

a

 

more

 

efficient

 

burn.

 

Содержание FP1LM Manoir

Страница 1: ...ntertek www valcourtinc com Manufactured by Stove Builder International Inc 250 rue Copenhague Saint Augustin de Desmaures Quebec Canada G3A 2H3 Tel 418 878 3040 Fax 418 878 3001 This manual is availa...

Страница 2: ...w fireplace It is important that you follow the installations guidelines exactly Failure to install this fireplace correctly could result in a house fire bodily injury or even death You may need to ob...

Страница 3: ...pliance of a Combustible Mantel Shelf 24 1 3 5 Fresh Air Intake Kit 25 1 3 6 Faceplate Installation VA1FE05 or VA1FE06 Sold Separately 27 1 3 7 The Use of the Fire Screen 28 1 4 Venting System Chimney...

Страница 4: ...ass 49 2 3 7 Plated Finish Maintenance 50 2 3 8 Glass Care Cleaning 50 Appendix 1 Optional Hot Air Distribution Kit Installation AC01375 AC01376 or AC01340 51 Appendix 2 Blower Maintenance or Replacem...

Страница 5: ...EPLACE CAUTION DO NOT OBSTRUCT AIR INTLETS THIS FIREPLACE NEEDS AIR FOR ITS GOOD OPERATION WARNING THIS FIREPLACE HAS NOT BEEN TESTED WITH A GAS LOG LIGHTER WARNING DO NOT USE MATERIAL OTHER THAN THOS...

Страница 6: ...E OPENING CREATING RISKS FROM BOTH FIRE AND SMOKE NEVER LEAVE THE FIREPLACE UNATTENDED WHEN IN USE WARNING THIS FIREPLACE HAS BEEN TESTED FOR USE WITH OPEN DOORS IN CONJUNCTION WITH MECHE DOORS ALWAYS...

Страница 7: ...es and the ANSI NFPA 70 National Electrical Code are to be followed in the absence of local code requirements NOTE The Fireplace is not approved for use with a so called positive flue connection to th...

Страница 8: ...8 FP1LM Manoir Installation and Operation Manual...

Страница 9: ...FP1LM Manoir Installation and Operation Manual 9...

Страница 10: ...ed models or the Phase II emission levels of 5 1 g kg approximately 70 percent cleaner than unqualified models Participating manufacturers are expected to qualify under Phase 2 by 2013 The FP1LM Manoi...

Страница 11: ...n in the Section 1 2 1 FP1LM Manoir Wood Fireplace Specifications Next measure the area occupied by the fireplace which is normally 41 1 8 x 25 5 8 105 cm x 65 cm Note the floor construction and consu...

Страница 12: ...12 FP1LM Manoir Installation and Operation Manual CLEARANCES MINIMUM MEASUREMENTS A 72 1829 mm minimum E 2 51 mm B 12 305 mm maximum...

Страница 13: ...FP1LM Manoir Installation and Operation Manual 13...

Страница 14: ...replace and floor be in one piece In the case where the fireplace is installed directly on the floor the joint between the hearth extension and the fireplace E must also be protected by a non combusti...

Страница 15: ...use of an R value is convenient when more than one material is going to be used in the hearth extension to cover the combustible surface This is because R values are additive whereas K values are not...

Страница 16: ...ceptable For R values of some selected materials see Table Thermal Characteristics of Common Floor Protection Materials Example Required floor protection R of 1 00 Proposed materials four inches of br...

Страница 17: ...n 0 320 3 120 Limestone 6 5 0 153 Ceramic board Fibremax 0 450 2 2 Horizontal still air 1 8 0 135 0 920 Information as reported by manufacturers and other resources For a 1 8 thickness You cannot stac...

Страница 18: ...18 FP1LM Manoir Installation and Operation Manual CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm...

Страница 19: ...eplace running from floor to ceiling Position the studs back from the front edge of the fireplace leaving a space the thickness of the facing material so that the facing can be installed flush with th...

Страница 20: ...te installation CLEARANCES A 2 51 mm B 6 7 8 175 mm C 72 1829 mm minimum D 5 1 2 140 mm MEASUREMENTS E 41 1 8 1045 mm F 25 1 2 648 mm G 1 3 8 35 mm MAX When drywall panels or any other finishing mater...

Страница 21: ...ion LEGEND Combustible material allowed in this area Non combustible material only in this area MINIMUM MEASUREMENTS FOR FRESH AIR INTAKE K MINIMUM MEASUREMENTS FOR FORCED AIR KIT L H 12 305 mm 18 457...

Страница 22: ...the fireplace is to be used add its thickness to the measurement Values M and N are minimum measurements They may need to be increased to alloy installation of a Fresh air intake kit or forced air kit...

Страница 23: ...ecorative frame CAUTION MATERIALS MUST BE INSTALLED SO THAT THE FACEPLATE MAY BE REMOVED AFTER THE INSTALLATION THE FACEPLATE IS DESIGNED TO OVERLAP THE MATERIAL SURROUNDING THE FIREPLACE IF THE MATER...

Страница 24: ...fferent mantel shelf dimensions are listed in the following table However no combustible mantel shelf can be installed at less than 48 1219 mm above the bottom of the fireplace If the depth of the man...

Страница 25: ...M THE BASEMENT OR FROM A GARAGE THE OUTSIDE WALL TERMINATION SHOULD BE INSTALLED WHERE IT IS NOT LIKELY TO BE BLOCKED BY SNOW OR EXPOSED TO EXTREME WIND AND AWAY FROM AUTOMOBILE EXHAUST FUMES GAS METE...

Страница 26: ...to the wall with screws as shown bellow Place the insulated pipe over the register tube and over the fireplace outside air connector At each end carefully pull back the insulation and plastic cover e...

Страница 27: ...late Installation VA1FE05 or VA1FE06 Sold Separately In order to perform installation of VA1FE05 or VA1FE06 faceplate refer to Installation manual included in the faceplate kit VA1FE05 Fa ade moderne...

Страница 28: ...even if the glass doors are closed OPERATE ONLY WITH GLASS DOORS FULLY CLOSED OR FULLY OPEN WITH MECHE DOORS ALWAYS CLOSED IF DOORS ARE LEFT PARTLY OPEN GAS AND FLAME MAY BE DRAWN OUT OF THE OPENING C...

Страница 29: ...nada ULC S 604 Canada or UL S 610 U S A Factory built chimneys are tested as a system with all the necessary components for installation The instructions provided with the chimney by its manufacturer...

Страница 30: ...0 cm ICC Excel 2100 1 Solid Pack 8 20 cm Metal Fab Temp Guard 1 Solid Pack 8 20 cm American Metal HSS AC Triple Wall 8 20 cm American Metal HS AC Triple Wall 8 20 cm Olympia Chimney Ventis 1 Solid Pac...

Страница 31: ...a fireplace shall not vent any other appliance 4 The minimum chimney system height for a straight installation is 15 ft 4 5 m 5 All chimney installations must include at least one support Reducing the...

Страница 32: ...ings and roof that the chimney will go through to provide a 2 50 mm minimum clearance between the chimney and any combustible materials Do not fill this 2 space with insulation or any other combustibl...

Страница 33: ...tallation Some non illustrated parts may be required 1 5 1 Examples of Typical Chimney Installation A To insure a good draft it is recommended to have a length of 18 inches from the top of the unit to...

Страница 34: ...34 FP1LM Manoir Installation and Operation Manual Direct installation Exterior offset installation...

Страница 35: ...loor and ceiling holes are in accordance with the chimney manufacturer s instructions 2 From below install a firestop B supplied by the chimney manufacturer in each ceiling floor separation through wh...

Страница 36: ...5 Then put the roof flashing E in place and seal the joint between the roof and the flashing with roofing pitch For sloping roofs place the flashing under the upper shingles and on top of the lower s...

Страница 37: ...anoir Installation and Operation Manual 37 THE STRUCTURAL INTEGRITY OF THE FLOOR WALL AND CEILING ROOF MUST BE MAINTAINED NOTE THE FLOOR AND WALLS BELOW THE ATTIC MUST BE INSULATED USING THE SAME INSU...

Страница 38: ...If the offset length is made of two 2 chimney lengths or more many chimney manufacturers may require that you use an offset or roof support halfway up the offset If penetrating a wall install a wall...

Страница 39: ...f to support the chimney 2 It may be used on a floor ceiling or roof above an offset to support the chimney above the offset 3 It may be used on a floor ceiling or roof as a supplementary support For...

Страница 40: ...A QUALIFIED CHIMNEY SWEEPER The following requirements must be respected 1 The chimney must be absolutely clear of any soot residue or creosote Check for cracks loose or missing bricks that could inh...

Страница 41: ...0 3 Increase the size of the hole until a 45 or 30 insulated liner adapter B can be easily slipped through 4 Slide the liner C down from the top of the masonry chimney until you reach the hole level 5...

Страница 42: ...FIREPLACE CAUSING DAMAGE TO THE UNIT A HOME FIRE OR EVEN POSSIBLY IGNITING A CHIMNEY FIRE IF THE CHIMNEY IS CREOSOTED CAUTION DO NOT OVER FIRE THIS HEATER OVER FIRING CAN RESULT IN A SAFETY HAZARD AND...

Страница 43: ...ewspaper and the kindling are well ignited you may close the glass door for a few minutes so that the firebox and chimney of your fireplace can heat up enough for optimal operation When this heating p...

Страница 44: ...e may be a small amount of smoking upon lighting the fire until the chimney heats up but this should not continue If the fireplace continues to smoke it is probably for one of the following reasons A...

Страница 45: ...IMPORTANT NOTES a Do not burn coal The sulphur in coal will corrode the firebox b Do not allow the wood to smoulder or burn without flame since this will produce excessive creosote in the unit c The e...

Страница 46: ...amily of the possible danger 3 If you require assistance alert your fire department 4 If possible use a dry chemical fire extinguisher baking soda or sand to control the fire Do not use water as it ma...

Страница 47: ...the insulation paper behind them is detached from the walls of firebox You must properly position the insulation paper or get a new one from your dealer before putting the new refractory panels To re...

Страница 48: ...anoir Installation and Operation Manual 3 Remove the two panel holders D and the refractory panels E and F 4 Remove the back refractory panel G To install new refractory panel follow the above steps i...

Страница 49: ...king care that it is perfectly centred on the gasket Peel off more of the backing and rotate the glass and press the next section onto the gasket Do not stretch the gasket as you place it Do not apply...

Страница 50: ...cloth to clean it Do not use abrasives such as steel wool steel pads or an abrasive cleaner for they may scratch the finish 2 3 8 Glass Care Cleaning To clean the glass there are a number of speciall...

Страница 51: ...talled with the FP1LM Manoir Hot air gravity kit Traditional style AC01375 Hot air gravity kit Modern style AC01376 Forced air kit AC01340 Hot air gravity kit Traditional style AC01375 The kit include...

Страница 52: ...VE GRILLE WITH ELBOW The safety rules and installation procedures for both AC01375 and AC01376 hot air ducting gravity kits are the following Minimum height 68 1 7 m Minimum distance from ceiling 12 3...

Страница 53: ...3 The hot air grilles can be installed in the same room as the fireplace or one or both of the grilles can be installed in adjacent or upper rooms Installing the ducts at different elevations will ten...

Страница 54: ...style AC01376 L ensemble comprend Decorative plate A Adjustable frame B Heat distribution box C 6x steel brackets D with fastening screws E and self tapping screws F 2x Finishing cap assemblies H AND...

Страница 55: ...FP1LM Manoir Installation and Operation Manual 55 DIMENSIONS OF HEAT DISTRIBUTION BOX 35 889mm 38 965mm 15 3 4 400mm 5 127mm 10 3 4 273mm...

Страница 56: ...6 FP1LM Manoir Installation and Operation Manual DIMENSIONS OF ADJUSTABLE DECORATIVE PLATE DIMENSIONS OF ASSEMBELED HEAT DISTRIBUTION BOX AND ADJUSTABLE DECORATIVE PLATE 34 7 8 886mm 37 940mm 38 965mm...

Страница 57: ...lation 1 Secure the 6 steel brackets D with 6 screws provided E on top of the fireplace 3 for each ducting Insert the ducting G not provided into each opening and secure it in place using the steel br...

Страница 58: ...8 8 210 mm 210 mm 4 The maximum number of elbows in a run of duct is two 5 Maintain at least 10 254 mm clearance from the outlet grille framing to a combustible ceiling side wall or mantel 6 When pas...

Страница 59: ...y may overheat 9 Do not use tees or any other components than the ones specifically listed here 10 All ducts must extend upwards or horizontally Never route the ducting downwards 11 The hot air outlet...

Страница 60: ...ts D installed previously with 6 other self tapping screws provided F 2 Secure the ducting G to the heat distribution box C with self tapping screws 3 per ducting Insert the adjustable frame B in the...

Страница 61: ...nection of insulated flexible pipe which enables you to heat adjacent rooms up to 50 feet from the fireplace This HVAC type pipe must comply with ULC S110 and or UL 181 Class 0 or Class 1 Standards an...

Страница 62: ...62 FP1LM Manoir Installation and Operation Manual APPENDIX 2 BLOWER MAINTENANCE OR REPLACEMENT 1 Open the bottom louver A 2 Cut the Tie wrap B...

Страница 63: ...tallation and Operation Manual 63 3 Lift the blower C located under the firebox towards the back Turn 90 to pull out 4 Unplug the blower s electric wires D and E Repeat the steps in reverse order to r...

Страница 64: ...qualified electrician Connect the wires from the power outlet to the terminal block making sure that the white wire matches the white wire on the terminal Connect the black wire with the black wire of...

Страница 65: ...FP1LM Manoir Installation and Operation Manual 65 APPENDIX 3 EXPLODED DIAGRAM AND PARTS LIST...

Страница 66: ...16 TRUSS QUADREX ZINC 16 11 SE59829 RH SIDE MECHE DOOR ASSEMBLY 1 12 SE59843 LH SIDE MECHE DOOR ASSEMBLY 1 13 30185 17 64 AA TYPE WASHER 2 14 44091 ROCKER SWITCH 2 POSITION MSR 8 1 15 44085 RHEOSTAT...

Страница 67: ...0 BOTTOM REFRACTORY PANEL 1 41 VA7070 CAST IRON ANDIRON 2 42 30109 BOLT HEX 1 4 20 X 1 4 43 AC01375 HOT AIR GRAVITY KIT TRADITONAL KIT 1 44 49066 90 DEGREE X 8 26Ga GALVANISED ELBOW 2 45 30640 GAKLVAN...

Страница 68: ...t not exceed the wholesale price of the replacement part All parts and labour costs covered by this warranty are limited according to the table below The manufacturer at its discretion may decide to r...

Отзывы: