46
FP1LM
Manoir
‐
Installation
and
Operation
Manual
A.
Initially
inspect
the
chimney
system
weekly.
From
this,
you
will
learn
how
often
it
will
be
necessary
to
clean
your
chimney.
B.
Have
your
chimney
cleaned
by
a
qualified
chimney
sweeper.
If
you
wish
to
clean
it
yourself,
we
recommend
using
a
stiff
plastic
or
non
‐
metallic
brush.
If
a
metal
brush
is
used,
its
size
should
be
slightly
smaller
than
the
flue
to
avoid
damaging
the
chimney.
Do
not
use
a
brush
that
will
scratch
the
stainless
steel
interior
of
the
chimney.
C.
Do
not
expect
chemical
cleaners
to
keep
your
chimney
clean.
The
rain
cap
can
be
removed
for
inspection
and/or
cleaning
of
the
chimney.
2.3.3
Dealing
With
a
Chimney
Fire
Regular
chimney
maintenance
and
inspection
can
prevent
chimney
fires.
If
you
have
a
chimney
fire,
follow
these
steps:
1.
Close
the
fireplace
glass
door
and
the
exhaust
damper;
2.
Alert
your
family
of
the
possible
danger;
3.
If
you
require
assistance,
alert
your
fire
department;
4.
If
possible,
use
a
dry
chemical
fire
extinguisher,
baking
soda
or
sand
to
control
the
fire.
Do
not
use
water
as
it
may
cause
a
dangerous
steam
explosion;
5.
Check
outside
to
ensure
that
sparks
and
hot
embers
coming
out
of
the
chimney
are
not
igniting
the
roof;
6.
Do
not
use
the
fireplace
again
until
your
chimney
and
fireplace
have
been
inspected
by
a
qualified
chimney
sweeper
or
a
Fire
Department
Inspector.
2.3.4
Disposal
of
Ashes
Ashes
should
be
placed
in
a
tightly
covered
metal
container,
they
should
be
taken
outside
immediately.
The
closed
container
of
ashes
should
be
placed
on
a
non
‐
combustible
floor
or
on
the
ground
well
away
from
all
combustible
materials
pending
final
disposal.
Ashes
normally
contain
some
live
charcoal
that
can
stay
hot
for
several
days.
If
the
ashes
are
disposed
of
by
burial
in
soil
or
otherwise
locally
dispersed,
they
should
be
retained
in
the
closed
container
until
all
cinders
have
thoroughly
cooled.
Other
waste
should
not
be
placed
in
this
container.
Содержание FP1LM Manoir
Страница 8: ...8 FP1LM Manoir Installation and Operation Manual...
Страница 9: ...FP1LM Manoir Installation and Operation Manual 9...
Страница 13: ...FP1LM Manoir Installation and Operation Manual 13...
Страница 18: ...18 FP1LM Manoir Installation and Operation Manual CLEARANCES A 16 406 mm B 46 1168 mm C 8 203 mm...
Страница 34: ...34 FP1LM Manoir Installation and Operation Manual Direct installation Exterior offset installation...
Страница 65: ...FP1LM Manoir Installation and Operation Manual 65 APPENDIX 3 EXPLODED DIAGRAM AND PARTS LIST...