MCP-4J Quick Start Guide
IS0368
Valco Melton
44
Purge and Test Run
1.
Purge all air from the glue line, and then connect to the
valve. Purge the valve by activating the push button
switch on the valve.
Scanner and valve cables must be
connected before any purging can
take place. Be certain all cables and
lines are connected.
2.
Run adhesive through the valve(s) until no air is present
in the line.
3.
Run the parent machine and stop it when the product
reaches the glue station.
4.
Adjust the glue station vertically to ensure the product is
level.
5.
Slowly jog the product through the glue station making
any needed adjustments to the glue station guides and
brackets as you go.
6.
Start up the parent machine and run 2-4 products
through the glue station.
7.
Measure the glue line with a tape measure. Make
certain the glue line is in the correct place on the
products tested.
If the glue is not in the proper place on
the products, refer to the MCP-4J
Manual (MC122) for fine tune
adjustment procedures.
8.
If the glue is in the proper place on the products tested,
you can run the machine at normal operating speed!
Congratulations! You have just set and tested the MCP-4J Control.
For more information, please see the MCP-4J Manual (MC122).
Содержание MCP-4J
Страница 4: ......
Страница 10: ...Table of Contents MC122 MCP 4J Control Unit 6 ...
Страница 12: ...Section 1 Introduction MC122 MCP 4J Control Unit 2 ...
Страница 20: ...Section 2 Safety and Use MC122 MCP 4J Control Unit 10 ...
Страница 38: ...Section 3 Basic features MC122 MCP 4J Control Unit 28 Wiring the Scanner Cable Continued ...
Страница 59: ...MC122 MCP 4J Control Unit Section 4 Programming 49 Protected Level Mode Continued ...
Страница 100: ...Section 6 Maintenance MC122 MCP 4J Control Unit 90 ...
Страница 102: ...Section 7 Specifications MC122 MCP 4J Control Unit 92 ...
Страница 104: ...Section 8 Part Number List MC122 MCP 4J Control Unit 94 MCP 4J Vertical with EPC 074xx084 JWT6119 dwg ...
Страница 107: ...MC122 MCP 4J Control Unit Section 8 Part Number List 97 MCP 4J Vertical w o EPC 074xx085 KMP0153 dwg ...
Страница 110: ...Section 8 Part Number List MC122 MCP 4J Control Unit 100 MCP 4J Vertical 3NC Tipsealer 074xx086 JWT6546 dwg ...
Страница 113: ...MC122 MCP 4J Control Unit Section 8 Part Number List 103 MCP 4J Horizontal with EPC 074xx087 JWT6113 dwg ...
Страница 116: ...Section 8 Part Number List MC122 MCP 4J Control Unit 106 MCP 4J Horizontal w o EPC 074xx088 KMP0154 dwg ...
Страница 122: ...Section 8 Part Number List MC122 MCP 4J Control Unit 112 MCP 4J Horizontal Dual External EPC 074xx090 KMP0159 dwg ...
Страница 130: ...Section 8 Part Number List MC122 MCP 4J Control Unit 120 ...
Страница 132: ...Section 9 Warranty MC122 MCP 4J Control Unit 122 ...
Страница 134: ...Section 10 Service MC122 MCP 4J Control Unit 124 ...
Страница 136: ...Appendix A Job Charts MC122 MCP 4J Control Unit 126 Job Number Job Name Description ...
Страница 146: ...Appendix C Instruction Sheets for the MCP 4J MC122 MCP 4J Control Unit 136 ...
Страница 156: ...MCP 4J Quick Start Guide IS0368 Valco Melton 10 Operator Panel ...