MUS033202
18/10/2010
VALCO MELTON S.L.U. Pol. Ind. Agustinos C/G 34 3116 0 ORCOYEN, NAVARRA
TEL: +34 948 321580 Fax: +34 948 326584 [email protected] www.valcomelton.com
18
3.1. INTRODUCTION:
This chapter explains how to install the machine correctly.
WARNING: The operations described in this chapter should be
performed by qualified personnel, following safety instructions
3.2.TRANSPORT:
The unit is supplied packed with a paperboard box.
To unpack it will remove top cover and front cover.
Unpack carefully to prevent damage to the machine. Inspect the
equipment for damages caused during transport.
3.3. INSTALLATION REQUIREMENTS:
Install the follower plate leaving enough space for the equipment to be
accessed during operations.