MUS033202
18/10/2010
VALCO MELTON S.L.U. Pol. Ind. Agustinos C/G 34 3116 0 ORCOYEN, NAVARRA
TEL: +34 948 321580 Fax: +34 948 326584 [email protected] www.valcomelton.com
68
7º
Once the filter has been disassembled, we recommend changing the
viton o’rings and the filter screen.
8º
Assemble the viton o’rings on the filter plug and the filter screen and
introduce the filter mount of the filter. Screw the unit into the filter unit.
9º
Introduce the filter in the manifold and screw it in with a screwdriver.
10º
Close the draining valve with a screwdriver.
11º
Put in the right working pressure.
8.3. REPAIRING THE MANIFOLD:
The manifold is the element that distributes the Hot – Melt, after it has
been filtered, to the hoses and guns.
Made of aluminium, it is assembled at the bottom of the tank so that
the tank resistances heat it indirectly.
The manifold has six outlet holes to connect the Hot – Melt hoses,
three at the rear and another three at the front.
The manifold should not be disassembled, this operation should
only be done if there is a leak of Hot- Melt between the tank and the
distributor.