22
BOILER INSTALLATION SEQUENCE
Cold water mains inlet
and hot water outlet
Flush all foreign matter from the mains
supply before connecting to the
boiler.
●
Connect the cold water service
valve (
1
) to the cold inlet water
connection of the appliance with
the washer (
2
) provided and tigh-
ten.
●
Connect cold water service pipe to
the cold water service valve and
tighten.
●
Connect the 15 mm hot water
outlet copper tail (
4
) to the hot
water outlet connection of the
appliance with the washer (
5
) pro-
vided and tighten.
●
Connect hot water outlet pipework
to the copper tail.
Note: The hot water outlet union nut
is packed in with the PRV fittings
pack.
1
2
3
4
5
6
I
0
Euro B/S 045/0GB_Pro
Fig. I.7: Fitting the hot and cold water connections
Содержание TURBOmax Pro 2 E
Страница 31: ...31 COMMISSIONING PART I...
Страница 32: ...32 COMMISSIONING PART I 2 5 3 4 Fig Com 1 Draining the heating system Eor B S 207 0GB_Pro...
Страница 65: ...65 FAULT FINDING...
Страница 71: ...71...