5
5
210
124163
03
240/242/280/282/824/828 Pro/Plus
60/100
07/2000
124163_03
1
3
2
18
BOILER INSTALLATION SEQUENCE
Using boiler template
Fix the paper template to the wall
ensuring that the correct flue exit
point has been identified, ensure that
the template is vertical.
The template shows
- The position of the fixing holes for
the boiler mounting bracket (
1
).
- The position of the connections.
- The position of the flue exit hole.
- Upper hole (
2
) indicates top outlet
flue with flue turret facing
rearward.
- Lower hole (
3
) indicates rear out-
let flue exiting directly through
wall.
Mark the position of the hanging
bracket fixing holes (
1
).
Drill 2 holes Ø 8 mm for the hanging
bracket.
Identify correct flue exit.
Mark the centre of the selected air/
flue duct and its circumference, e.g.
by drilling through the template.
For installation of a rear exit outlet
please refer to the installation instruc-
tions of the rear exit outlet kit
(Art. No 303817).
Other flue options
Flue instructions for other flue systems
such as vertical RSF flues, flues run to
the side of the boiler and the use of
additional bends etc. are detailed in
the flue installation instructions
provided with the boiler.
Remove the template from the wall
and plug the drilled holes using the
wallplugs supplied.
Note:
Use alternative fixing holes
where necessary.
Fig. I.3: Using Boiler template
Содержание TURBOmax Pro 2 E
Страница 31: ...31 COMMISSIONING PART I...
Страница 32: ...32 COMMISSIONING PART I 2 5 3 4 Fig Com 1 Draining the heating system Eor B S 207 0GB_Pro...
Страница 65: ...65 FAULT FINDING...
Страница 71: ...71...