26
BOILER INSTALLATION SEQUENCE
Euro B/S 048/1
Socket X2 for internal unit components
Socket X4 for minority reversing valve
Socket X7 for accessory box connection
Socket X8 for VRC-VC connection
Room thermostat, 230 V: connections 3, 4 and 5
Socket X12: pump connection
Socket X14: gas valve connection
Socket X13: fan unit connection
Mains power supply: connections L, N and earth
Do not use!
Electronic board layout
Fig. I.11: Connection wiring
Содержание TURBOmax Pro 2 E
Страница 31: ...31 COMMISSIONING PART I...
Страница 32: ...32 COMMISSIONING PART I 2 5 3 4 Fig Com 1 Draining the heating system Eor B S 207 0GB_Pro...
Страница 65: ...65 FAULT FINDING...
Страница 71: ...71...