11
Instructions for installation and servicing ecoTEC
1
2
3
4
8
9
7
6
5
Fig. 3.1 Scope of delivery for ecoTEC plus 600 series
DO NOT remove the boiler from the polystyrene base at
this stage.
Item
Quantity
Description
1
1
Hanging bracket
2
1
Appliance
3
1
Bottom cover
4
4
Connecting pipes (gas, heating, safety valve)
5
3
Isolating cocks
6
1
Template
7
1
Benchmark logbook
8
3
User, installation and maintenance and flue
assembly manuals
9
2
Bag with small items
2
For LPG appliances, extra: 1 sticker each for
tank and ventilation (above Fig.)
Table 3.1 Scope of delivery for ecoTEC plus 600 series
1
2
3
4
6
5
8
9
7
Fig. 3.2 Scope of delivery for ecoTEC plus 800 series
DO NOT remove the boiler from the polystyrene base at
this stage.
Item
Quantity Description
1
1
Hanging bracket
2
1
Appliance
3
1
Bottom cover
4
6
Connecting pipes (gas, heating, water, safety
valve)
5
4
Isolating cocks
6
1
Template
7
1
Benchmark logbook
8
3
User, installation and maintenance and flue
assembly manuals
9
2
Bag with small items
2
For LPG appliances, extra: 1 sticker each for
tank and ventilation (above Fig.)
Table 3.2 Scope of delivery for ecoTEC plus 800 series
General requirements 3
Содержание ecoTEC pro 28
Страница 55: ......
Страница 56: ...839592_00 GB 11 2004...