17
Instructions for installation and servicing ecoTEC
4.1.1 Select position for boiler
Refer to section ‘Boiler location’ for information regard-
ing the appliance location. In general the boiler must be
positioned such that:
• There is adequate space around the boiler for service
and maintenance
• The boiler can be correctly flued, i.e. the flue terminal
position is located in accordance with these instruc-
tions and the air/flue duct can be installed in accord-
ance with the flue installation instructions supplied.
• All necessary pipework can be connected, including
the pressure relief valve and condensate drain.
4.1.2 Unpack the boiler
To unpack the boiler, cut both plastic carton straps, open
box and lift out the polystyrene top packing. Lift the
cardboard box upwards.
Note
Care should be taken not to scratch the white
surface of the boiler casing
4.1.3 Using boiler template
• Fix the paper template to the wall ensure that the
template is vertical.
The template shows:
– The position of the fixing holes for the boiler mounting
bracket.
– The position of the connections.
– The position of the flue exit hole.
• Mark the position of the hanging bracket fixing holes.
• Drill 2 holes Ø 8 mm for the hanging bracket.
Note
Use alternative fixing holes where necessary.
60/100
256723_01
11 2
004
5
95
16
5
25
180
20
17
5
5
45°
A
A
A
A
A
106
5
450
Fig. 4.2 Assembly template
Boiler installation sequence 4
Содержание ecoTEC pro 28
Страница 55: ......
Страница 56: ...839592_00 GB 11 2004...