![Vaillant ecoPOWER 3.0 /2 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/vaillant/ecopower-3-0-2/ecopower-3-0-2_installation-and-maintenance-instructions-manual_848913008.webp)
4 Set-up
8
Installation and maintenance instructions ecoPOWER 3.0 /2, ecoPOWER 4.7 /2 0020241403_02
–
The flue pipework must not be completely walled in.
▶
Secure the flue pipework using pipe clamps that are isol-
ated from structure-borne sound.
▶
Consider additional sound insulation measures in each
case.
4.5.3
Environmental conditions
The product is designed for installation in dry, frost-free
rooms with non-explosive atmospheres.
The product's electronics are cooled using room air. To en-
sure sufficient cooling, the temperature in the installation
room must not exceed 40 °C.
The air humidity must not be higher than 75%.
4.6
Product dimensions
1370
660
103
132
1085
762
65
4.7
Minimum clearances and installation
clearances
> 550
< 232
300
700
500
400
The specified minimum clearances and installation clear-
ances are required for installing/setting up the product as
well as for carrying out future maintenance work.
4.8
Installing the product
1.
Place the product on level ground.
2.
Place the absorption dampers under the product's feet.
3.
Remove the transport lock (cable tie) from the coolant
reservoir's retainer.
4.
Refit the side panels if you removed for transport.