47
20901559_EN_RE_RZ_V7_230523
Commissioning (operation)
4.
4.
Fill the pump completely with new oil (more than mark "max.")
for corrosion protection.
Attention
Attention
: Before restarting the pump, drain oil to the maxi
‑
mum oil level (mark ”max.”).
5.
5. Close the manual gas ballast valve.
6.
6.
Clean the vacuum pump in the event of external contamina‑
tion.
7.
7.
Close the vacuum pump's inlet and outlet, e.g., with the
transport caps.
8.
8.
Package the vacuum pump such that it is protected from
dust; enclose desiccants if necessary.
9.
9.
Store the vacuum pump in a cool, dry location.
If damaged parts are stored for operational reasons, these should
be clearly identified as not ready for use
not ready for use
.
Carry out oil change and, if necessary, maintenance prior to use
if the pump has been stored for longer than one year.
IMPORTANT!
Содержание RE 2.5
Страница 1: ...Instructions for use OI no 20901559 Original instructions EN RE 2 5 RZ 2 5 RE 6 RZ 6 Rotary Vane Pump ...
Страница 24: ...24 20901559_EN_RE_RZ_V7_230523 Introduction ...
Страница 40: ...40 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 48: ...48 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 73: ...73 20901559_EN_RE_RZ_V7_230523 Appendix 8 8 8 8 CU Certificate CU Certificate CU Certificate ...
Страница 76: ...76 20901559_EN_RE_RZ_V7_230523 ...
Страница 77: ...77 20901559_EN_RE_RZ_V7_230523 ...
Страница 78: ...78 20901559_EN_RE_RZ_V7_230523 ...
Страница 79: ...79 20901559_EN_RE_RZ_V7_230523 ...