46
20901559_EN_RE_RZ_V7_230523
Commissioning (operation)
5.3
5.3
Switch off
Switch off
Switch off the vacuum pump
1.
1.
Stop the process.
2.
2. In case, close the in‑line valve in the inlet line of the vacuum
pump.
3.
3. Allow the vacuum pump to continue running for approx.
30 minutes with open gas ballast valve if the vacuum pump
has been exposed to condensate.
(1)
I
o
4.
4.
Switch off rocker switch
(1)
– switch position
0
.
5
Vacuum pump switched off.
5.
5.
Disconnect the vacuum pump from the apparatus.
6.
6. Check the vacuum pump for possible damage and
contamination.
5.4
5.4 Shutdown (storage)
Shutdown (storage)
Take the vacuum pump out of operation
1.
1. Carry out the steps for switch off
,
see chapter:
2.
2. Flush the pump with dry nitrogen.
Connect dry nitrogen
(max. 1,2 bar / 900 Torr absolute) to the
pump inlet or to the gas ballast and
operate the pump briefly
(for approximately 1 minute).
3.
3. Carry out oil change to protect the pump,
see chapter:
.
Switch off
Shutdown
Содержание RE 2.5
Страница 1: ...Instructions for use OI no 20901559 Original instructions EN RE 2 5 RZ 2 5 RE 6 RZ 6 Rotary Vane Pump ...
Страница 24: ...24 20901559_EN_RE_RZ_V7_230523 Introduction ...
Страница 40: ...40 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 48: ...48 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 73: ...73 20901559_EN_RE_RZ_V7_230523 Appendix 8 8 8 8 CU Certificate CU Certificate CU Certificate ...
Страница 76: ...76 20901559_EN_RE_RZ_V7_230523 ...
Страница 77: ...77 20901559_EN_RE_RZ_V7_230523 ...
Страница 78: ...78 20901559_EN_RE_RZ_V7_230523 ...
Страница 79: ...79 20901559_EN_RE_RZ_V7_230523 ...