Commissioning (operation)
5
5 Commissioning (operation)
Commissioning (operation)
5.1
5.1 Switch on
Switch on
Switch on the vacuum pump
(1)
I
o
>
Switch rocker switch
(1)
on – switch position
I
.
5.2
5.2 Operation
Operation
Warm-up (warm-up time)
>
The warm‑up time enables the vacuum pump to reach full
operating capacity. A warm up period of typically 30 min
‑
utes is required to ensure that the rated ultimate vacuum and
pumping speed and the full vapor pumping rate are attained.
>
If necessary, install an in‑line solenoid valve or shut‑off valve
in the inlet line to isolate your application from the vacuum
pump to allow the pump to warm up.
Operating conditions
>
Pumping down can be started at any pressure at the inlet
below atmospheric pressure.
>
Do not start the pump, if the pressure at the outlet port
exceeds 16.0 psi (1.1 bar) absolute.
>
Continuous operation is possible at any pressure below
atmospheric pressure.
>
Avoid overpressure of more than 17.5 psi absolute (1.2 bar
absolute) in the event that inert gas is connected to the pump,
to the gas ballast or to a venting valve.
Switch on the
vacuum pump
Inlet pressure,
outlet pressure
Содержание RE 2.5
Страница 1: ...Instructions for use OI no 20901559 Original instructions EN RE 2 5 RZ 2 5 RE 6 RZ 6 Rotary Vane Pump ...
Страница 24: ...24 20901559_EN_RE_RZ_V7_230523 Introduction ...
Страница 40: ...40 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 48: ...48 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Страница 73: ...73 20901559_EN_RE_RZ_V7_230523 Appendix 8 8 8 8 CU Certificate CU Certificate CU Certificate ...
Страница 76: ...76 20901559_EN_RE_RZ_V7_230523 ...
Страница 77: ...77 20901559_EN_RE_RZ_V7_230523 ...
Страница 78: ...78 20901559_EN_RE_RZ_V7_230523 ...
Страница 79: ...79 20901559_EN_RE_RZ_V7_230523 ...