Installation of OPTBJ board
vacon • 13
Local contacts: https://www.danfoss.com/en/contact-us/contacts-list/
3
3
Open the inner cover to reveal the option board slots and install the OPTBJ board
into slot
E
. Close the inner cover.
NOTE!
See Chapter
4.2
for the jumper settings!
4
If shielded cable is used, ground the shield of the OPTBJ cable to the frame of
the drive by using the grounding clamp for control cable included in the delivery
of the drive.
NOTE!
If shielded cable is used, grounding must be done according to best prac-
tice.
E
3041A_00
11574A_uk
Grounding clamp for
control cable
Содержание optbj
Страница 2: ......
Страница 5: ...Approvals vacon 5 Local contacts https www danfoss com en contact us contacts list 1 ...
Страница 6: ...1 vacon 6 Approvals Local contacts https www danfoss com en contact us contacts list ...
Страница 7: ...Approvals vacon 7 Local contacts https www danfoss com en contact us contacts list 1 ...
Страница 8: ...1 vacon 8 Approvals Local contacts https www danfoss com en contact us contacts list ...
Страница 9: ...Approvals vacon 9 Local contacts https www danfoss com en contact us contacts list 1 ...