installation
vacon
• 13
24-hour service: +358-40-8371 150
•
Email: [email protected]
4
D
Install LonWorks option board in slot E
on the control board of the frequency
converter. Make sure that the grounding
plate (see below) fits tightly in the
clamp.
21
22
23
H3
H2
H1
X5
lw1.fh8
E
Make a sufficiently wide opening for
your cable by cutting the grid as wide as
necessary.
F
Close the cover of the control unit and
the cable cover.
Archived Document