background image

ENGLISH

- 42 -

16 - MAINTENANCE

Maintenance should be performed in full compliance with the 
safety instructions described in this manual and in accordance 
with current legal and regulatory provisions.
The recommended interval between each maintenance operation 
is six months, the checks involved should at least relate to:

•  the perfect efficiency of all warning devices
•  the perfect efficiency of all safety devices
•  measurement of the gate operating forces
•  the lubrication of mechanical parts on the automation device 

(where necessary)

•  the state of wear of the mechanical parts on the automation 

device

•  the state of wear of the electrical cables on the 

electromechanical actuators

The result of each check should be recorded in a gate
maintenance log.

 17 - DISPOSAL OF THE PRODUCT

As for the installation operations, even at the end of this product’s 
life span, the dismantling operations must be carried out by 
qualified experts.

This product is made up of various types of materials: some can be 
recycled while others need to be disposed of. Find out about the 
recycling or disposal systems envisaged by your local regulations 
for this product category.

Important! 

– Parts of the product could contain pollutants or 

hazardous substances which, if released into the environment, 
could cause harmful effects to the environment itself as well as to 
human health.
As indicated by the symbol opposite, throwing away this product 
as domestic waste is strictly forbidden. So dispose of it as 
differentiated waste, in accordance with your local regulations, 
or return the product to the retailer when you purchase a new 
equivalent product. 

Important! 

– the local applicable regulations may envisage heavy 

sanctions in the event of illegal disposal of this product.

15 - TESTING AND START-UP

In implementing the automation device, these are the most 
important steps for guaranteeing maximum safety.

V2 recommends the application of the following technical 
standards:
•  EN 12445 (Safety in the use of automated closures, test 

methods)

•  EN 12453 (Safety in the use of automated closures, 

requirements)

•  EN 60204–1 (Safety of Machinery, electrical equipment of 

machines, part 1: general principles)

In particular, with reference to the table in the section 
“PRELIMINARY CHECKS and IDENTIFICATION OF THE TYPE OF 
USE” in the majority of cases, it will be necessary to measure the 
impact force, in accordance with the provisions of EN 12445.

Adjusting the operating force is possible by programming the 
electronic circuit board, and the impact force profile should be 
measured using an appropriate device (itself also certified and 
subjected to annual calibration) capable of tracing the force-time 
graph.

The result should be in compliance with the following maximum
values:

1400 N 

L > 500 mm 

400 N

L = 50 ÷ 500 mm

150 N 

25 N 

0.75 s 

5 s 

Dynamic
IMPACT force

Static CRUSHING
force

Time

Force

Содержание TORQ500A-230V

Страница 1: ...ORREVOLI FINO A 800 KG DI PESO GB 230V ELECTRO MECHANICAL IRREVERSIBLE RACK ACTUATOR FOR SLIDING GATES UP TO 800 KG F OPERATEUR ELECTROMECANIQUE IRREVERSIBLE 230V POUR PORTAILS COULISSANTS JUSQU A 800...

Страница 2: ...300 3 325 88 5 88 5 161 177 70 325 5 150 185...

Страница 3: ...THE AUTOMATION MOVEMENT 8 2 PROGRAMMING OF THE WIDTH OF THE PEDESTRIAN OPENING 8 3 ADVANCED PROGRAMMING OF THE AUTOMATION MOVEMENT 9 LED SIGNALLING 9 1 INPUT STATUS SIGNALLING LEDS 9 2 ERROR SIGNALLI...

Страница 4: ...make any modifications to any part of the automation device or the accessories connected to it unless described in this manual Any other modifications will void the warranty on the product The instal...

Страница 5: ...are authorised for use and closure is not in a public area Examples of this type are gates inside business premises where the sole users are employees or a part of them who have been suitably informed...

Страница 6: ...nigi CN Italy Under its sole responsibility hereby declares that the partly completed machinery model s TORQ500A 230V TORQ800A 230V Description electromechanical actuator for sliding gates is intended...

Страница 7: ...t for the complete setting of the concrete 6 Unscrew the bolts fixing the base to the clamps and put the motor on the plate 7 Insert the 4 grains with their nuts in the proper place Adjust the 4 grain...

Страница 8: ...TOR Check the following points 1 the motor must be on a levelled surface and perfectly parallel to the gate 2 the distance between pinion and rack must be 1 or 2 mm If needed adjust the 4 grains 3 the...

Страница 9: ...r working of the system we suggest to weld the end of stroke brackets on the rack 3 5 MOTOR OVERRIDING SYSTEM mATTENTION before operating the manual release disconnect the power The motor is anyway di...

Страница 10: ...ONAL ACCESSORIES LENGTH OF THE CABLE 10 metres from 10 to 20 metres from 20 to 30 metres Power supply 230V 120V 3G x 1 5 mm2 3G x 1 5 mm2 3G x 2 5 mm2 Photocells TX 2 x 0 5 mm2 2 x 0 5 mm2 2 x 0 5 mm2...

Страница 11: ...immer clockwise increases the pause time from 0 to 180 seconds Please note the AUTO dip switch must be put to ON DELAY NOT USED mVarying the POWER trimmer has no effect until the stroke is reprogramme...

Страница 12: ...230Vac max 15W AUX AUX contact electric lock PH 01 Photocell safety edge Normally closed contact PH 02 Photocell safety edge Normally closed contact GND Common of the PH01 PH02 terminals VA Rated powe...

Страница 13: ...the gate open they have no effect 6 5 GATE OPEN PILOT LIGHT If the photo test which is deactivated by default see Paragraph 11 1 is not used it is possible to connect a gate status pilot light to the...

Страница 14: ...of all the transmitters that you want to program the red radio LED flashes and the green start LED stays on steady 4 Press the SET and RADIO buttons simultaneously or wait 10 seconds to exit the proce...

Страница 15: ...Position the door in the fully closed position 2 Press the SET button for 2 seconds the yellow set LED flashes 3 Press the START button for 1 second the yellow set LED lights up steadily 4 Press the S...

Страница 16: ...lashes when a command is received through King Gates transmitter is off when the control unit is in standby mode 9 2 ERROR SIGNALLING LEDS RED ERROR LED The red error LED signals any errors that hampe...

Страница 17: ...is function the AUX output must be set to courtesy light see Paragraph 10 2 1 Press the RADIO button for 1 second the red radio LED lights up steadily 2 Press the SET button for 1 second the yellow se...

Страница 18: ...seconds to exit the procedure the LEDs return to the normal operating configuration 11 SAFETY DEVICE ADVANCED PROGRAMMING SEQUENCES These programming sequences are not essential to the system s operat...

Страница 19: ...SET and RADIO buttons simultaneously or wait 10 seconds to exit the procedure the LEDs return to the normal operating configuration mIn order to carry out the check on the safety devices the connecte...

Страница 20: ...ramming sequences and the settings adjustable through the dip switches To perform a new programming sequence or make a dip switch trimmer modification effective the protection must be deactivated 1 Pr...

Страница 21: ...throughout the entire manoeuvre If there are multiple photocell pairs these may signal false obstacles Try bridging the PHO1 PHO2 and STOP contacts to verify whether the problem can be resolved Otherw...

Страница 22: ...self as well as to human health As indicated by the symbol opposite throwing away this product as domestic waste is strictly forbidden So dispose of it as differentiated waste in accordance with your...

Страница 23: ...t this period may vary depending on the intensity of use Any inspection maintenance or repairs should only be performed by qualified personnel Even if you think you know how do not modify the system a...

Страница 24: ...V2 S p A Corso Principi di Piemonte 65 67 12035 RACCONIGI CN ITALY Tel 39 0172 812411 Fax 39 0172 84050 info v2home com www v2home com...

Отзывы: