4 - PREPARATION OF THE BASE FOR
AUTOMATION
1.
Provide a foundation pit and arrange one or more conduits for
the passage of the electrical cabling (FIG. 1).
2.
Assemble the 4 anchoring brackets on the mounting plate and
fasten with the 8 bolts provided (FIG. 2).
3.
Pour the concrete into the inside of the pit and position the
base plate
m
NOTE: verify that the plate is perfectly leveled and
parallel to the opening barrier
4.
Wait for the complete setting of the concrete
5.
Unscrew the 4 nuts that hold the base joined to the anchoring
brackets and position the rack on the plate (FIG. 3).
NOTE: it is advisable to install the rack cabinet with the
inspection access flap turned towards the more accessible
side
60mm
10 cm
10 cm
30 cm
FIG. 1
FIG. 2
FIG. 3
Содержание 36A022
Страница 2: ...1153 mm 320 mm 287 mm 218 mm 897 mm 1168 mm 374 mm 239 mm 319 mm 897 mm...
Страница 7: ...ITALIANO 5 NIUBA4 NIUBA6...
Страница 11: ...ITALIANO 9 FIG 3 FIG 4...
Страница 13: ...ITALIANO 11 A D E C F F G E A B D C O N M...
Страница 31: ...ITALIANO 29...
Страница 34: ...ITALIANO 32...
Страница 39: ...ENGLISH 37 NIUBA4 NIUBA6...
Страница 43: ...ENGLISH 41 FIG 3 FIG 4...
Страница 45: ...ENGLISH 43 A D E C F F G E A B D C O N M...
Страница 63: ...ENGLISH 61...
Страница 66: ...ENGLISH 64...
Страница 71: ...FRAN AIS 69 NIUBA4 NIUBA6...
Страница 75: ...FRAN AIS 73 FIG 3 FIG 4...
Страница 77: ...FRAN AIS 75 A D E C F F G E A B D C O N M...
Страница 95: ...FRAN AIS 93...
Страница 98: ...FRAN AIS 96...
Страница 103: ...ESPA OL 101 NIUBA4 NIUBA6...
Страница 107: ...ESPA OL 105 FIG 3 FIG 4...
Страница 109: ...ESPA OL 107 A D E C F F G E A B D C O N M...
Страница 127: ...ESPA OL 125...
Страница 130: ...ESPA OL 128...
Страница 131: ......