D291308.5q.fm
Preparing the Work Area
Chapter 2: Setup
9
When loading, unloading or running the PT-55, the operator should stand in front of the machine
controller to assure easy access to all controls. This position also allows the operator to view all
parts of the PT-55 while it is in operation.
Allow at least 24” clearance at the front and sides of the machine for easy access and operation.
(Pictured in the overhead view below.)
The PT-55 will also require access to a 120/230 VAC, 50-60 Hz power supply. Locate the
machine so electrical power cables can be routed away from areas where personnel are
expected to move. It is recommended that cables be routed overhead or underground. If cables
must be routed over the floor, cover them with rubber ramps.
Allow 24 inches clearance on front and sides.
Содержание PT-55
Страница 2: ......
Страница 4: ......
Страница 76: ...66 PT 55 User s Guide Customizing the Main Screen Logo D291308 7M fm...
Страница 87: ...D291566 1 fm Appendix A Changing the Computer BIOS Setting A 1 Appendix A Changing the Computer BIOS Setting...
Страница 90: ......
Страница 94: ...PT 55 Spare Parts List D291427h fm Page 1 of 1...
Страница 106: ...Service and Parts Contacts 61053915 fm Page 2...
Страница 108: ......
Страница 110: ......
Страница 111: ......
Страница 112: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...